Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/30/2010 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 03/26/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS AT THIS TIME | |
| 01/21/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS | |
| 01/07/2009 | STORMWATER FOLLOW-UP INSP | Partial Approval | VERTICAL WORK CONTINUING NO STORMWATER CONCERNS |
|
| 11/26/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | VERTICAL WORK CONTINUING | |
| 10/21/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS | |
| 09/05/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORMWATER CONCERNS | |
| 06/26/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | TALKED TO GORDON ON THE PHONE RE STORMWATER CONTROLS ALL HAS LOOKED GOOD IN THE PAST, DRAINAGE CHANNEL IS COMPLETE AROUND SITE DISCUSSED CONTINUING BMPS TO PREVENT MIGRATION OF SILT/POLLUTANTS INTO COT CONVEYANCES |
|
| 04/29/2008 | STORMWATER FOLLOW-UP INSP | Partial Approval | WORK CONTINUING ON NEW CHAPEL NO STORMWATER CONCERNS AT THIS TIME |
|
| 11/30/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | ASPHALT HAS BEEN PLACED GRADING WORK TO START ON SECOND PART OF LOT AND FOOTERS BEING DUG |
|
| 11/13/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | SWEEPER RUNNING CONSTANTLY DURING HAUL | |
| 10/31/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE WORK CONTINUING NO STORMWATER CONCERNS |