Inspection History Details
Inspection Status: Closed
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T05BU01344
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Closed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/13/2020 | STORMWATER FOLLOW-UP INSP | Closed | THIS SITE IS BEING CLOSED AT THIS TIME, THE SITE HAD CORRECTIONS THAT WERE NEEDED IN 2013 WHEN IT WAS LAST INSPECTED. | |
07/01/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
01/07/2013 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
09/24/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | NO CHANGES, SITE IS STILL IN NON-COMPLIANCE WITH SWPPP AND AZPDES. NEW OWNERS? NO CONTACT OR ACTIVITY ON SITE |
|
07/14/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | SOME EROSION DAMAGE DUE TO STORM WATER RUN-OFF. SEDIEMNT CONTROLS NEED RE-ESTABLISHED IN SOME AREAS. NO CONTRACTOR ON SITE, SOME OCCUPIED BLDG. SITE MAYBE 1/4 COMPLETED, MAJORITY OF SITE WORK COMPLETED. |
|
10/30/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CHANGES | |
10/16/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | SITE STILL UNDER STORM WATER PLAN UNTIL PAVED. CONTINUE TO KEEP UP WITH MATERIALS WASH OUT AND REQUIREMENTS UNDER YOUR PERMIT. |
|
09/27/2007 | STORMWATER FOLLOW-UP INSP | Violation | 1) NO-RESPONSE TO 9/13/07 STORM WATER INSPECTION - ADD SEDIMENT CONTROLS TO DRAINAGE CHANNEL ALONG THE NORTH SIDE. 2) UNABLE TO PROVIDE A PROPER CONCRETE/MATERIALS WASH OUT - INSTALL A WASHOUT PER YOUR PLAN. 3) PERFORM AND DOCUMENT STORM WATER SELF INSPECTIONS PER YOUR PLAN. COMPLY BY 10 WORKING DAYS - NON-COMPLIANCE WILL RESULT IN A STOP WORK ORDER AND POSSIBLE CITATION. |
|
09/13/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) PLACE SEDIMENT CONTROLS ALONG THE NORTH SIDE OF THE RIP RAP ROCK DRAINAGE CHANNEL LOCATED ON THE SE CORNER OF THE SITE. 2) ENSURE CONCRETE/CONSTRUCTION WASTE IS WASHED INTO CONTAINED AREAS AND DISPOSED OF PROPERLY. (WASH OUT IS FULL) 3) PROVIDE DOCUMENTATION OF STORM WATER SELF INSPECTIONS REQUIRED. NEW SUPERINTENDENT MARK 982-7139 |
|
08/07/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | NO ACTIVITY ON SITE - RAINING. NEED STORM WATER SELF INSPECTION FOR TODAY. CHANNEL IS CLEAN |
|
07/30/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | MOVE STOCKPILED SOIL THAT WAS REMOVED FROM THE DRAINAGE CHANNEL, SOIL IS ERODING BACK INTO CHANNEL, (SECOND NOTICE) | |
07/24/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | SOIL HAS BEEN REMOVED OUT OF THE DRAINAGE CHANNEL THAT RUNS ALONG THE EAST SIDE OF THE SITE. 1) MOVE STOCKPILED DIRT AWAY FROM EXISTING DRAINAGE LOCATED AT THE SE CORNER OF SITE OR PLACE SEDIMENT CONTROLS AROUND IT. 2) ESTABLISH A DESIGNATED CONCRETE/MATERIALS WASH OUT ON SITE PER YOUR SWPPP - SUBS DUMPING CONSTRUCTION MATERIALS ON GROUND. |
|
07/23/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | SOME OF THE SOIL DOWN IN THE DRAINAGE CHANNEL HAS BEEN REMOVED, HOWEVER PROBLEMS W/ EQUIPMENT HAS DELAYED THE COMPLETION. SUPERINTENDENT STATED THAT SOIL REMOVAL WILL BE COMPLETED BY WED 7/25/07. | |
07/18/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | MET WITH CONTRACTORS FROM RIVERWALK, CENTER FOR NEUROSCIENCE, ASHTON AND PIMA COUNTY TO DETERMINE RESPONSIBILITY FOR CLEAN UP OF DRAINAGE CHANNEL LOCATED BETWEEN CONSTRUCTION SITES. SITE SUPER FOR RIVERWALK AGREED TO CLEAN UP SOIL AND DERIS EXISTING IN CHANNEL. WILL RE-INSPECT FOR COMPLIANCE ON MONDAY 7/23/07. AFTER INITIAL CLEAN UP, PIMA COUNTY WILL BE RESPONSIBLE FOR ROUTINE MAINT. ON CHANNEL. | |
07/16/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | NEW SUPERINTENDENT : BUDDY PRINCE 349-8481 - SUN RIO COMPANIES. AGREED TO TAKE PART IN REMOVING SOIL ACCUMULATION IN DRAINAGE CHANNEL LOCATED ON THE EAST PERIMETER OF PROPERTY. WILL MEET TUESDAY 7/17/07 AT 8:30 WITH PIMA COUNTY (ASHTON), CENTER FOR NEUROSCIENCE (CAYLOR CONSTR) AND THE CITY OF TUCSON. |
|
06/11/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO STORM WATER COLNCERNS AT THIS TIME | |
02/28/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STROM WATER CHANGES OR CONCERNS AT THIS TIME | |
02/26/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME | |
02/14/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO SIGNIFICANT CHANGES | |
01/26/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | NO SIGNIFICANT STORM WATER CONCERNS AT THIS TIME. CLEAN OUT CONCRETE WASH OUT AND RE-ESTABLISH A CONTAINMENT AREA. PROVIDE A STAMPED DRAWING AND STATEMENT FROM THE ENGINEER OF RECORD SHOWING CHANGES MADE TO THE PERIMETER WALL ALONG THE SOUTH SIDE FOR CITY OF TUCSON APPROVAL. |
|
12/28/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | NO RESPONSE TO REQUEST MADE ON 12/5/06 TO RE-ESTABLISH WADDLE IN FRONT OF SCUPPER ON NE CORNER OF SITE; AND ESTABLISH A DESIGNATED CONCRETE WASH OUT ON SITE. CORRECT BY 2 WEEKS FROM DATE OF INSPECTION. NON-COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. |
|
12/05/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) RE-ESTABLISH BMP'S AT SCUPPER LOCATED AT SE CORNER OF SITE. 2) ESTABLISH A DESIGNATED CONCRETE WASH-OUT PER YOUR SWPPP. 3) ENSURE SUBCONTRACTORS CONTAIN CONSTRUCTION MATERIALS WASH-OUT AND DISPOSE OF WASTE PROPERLY. 4) ENSURE ALL CHEMICALS ON SITE ARE STORED PROPERLY AND LEAKS ARE CLEANED UP AND DISPOSED OF PER PLAN. 5) PROVIDE A STATEMENT FROM THE ENGINEER OF RECORD STATING THATIT IS ACCEPTABLE TO BACKFILL THE VOID SPACE BETWEEN THE CONSTRUCTED RETAINING WALL AND THE EXISTING CMU WALL ASSOCIATED WITH THE ADJACENT PROJECT. ACCEPTANCE FROM THE CITY OF TUCSON IS ALSO REQUIRED. |
|
10/02/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | RE-ESTABLISH SEDIMENT CONTROLS AT SE CORNER AT OUTFALL WHERE THERE IS NO WALL. NO OTHER STORM WATER CONCERNS AT THIS TIME. |
|
09/08/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | RAINING ON SITE, NO ACTIVITY ON SITE. CAN'T DRIVE ON SITE WITH TRUCK, TOO MUDDY. PROVIDE PROOF OF YOUR DESIGNATED CONCRETE/MATERIALS WASH OUT AS REQUIRED BY YOUR SWPPP. |
|
08/29/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) RE-ESTABLISH SEDIMENT CONTROLS AT SE CORNER, WHERE OUTFALL IS LOCATED AND NO WALL IS CONSTRUCTED. 2) PROVIDE A DESIGNATED CONCRETE WASHOUT PER PLAN - 4TH ATTEMPT TO ESTABLISH A DESIGNATED WASH OUT AREA ON SITE. COMPLY BY TUESDAY 9/5/06. NON COMPLIANCE WILL RESULT IN A NOTICE OF VIOLATION. |
|
08/04/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) SEDIMENT CONTROLS ALONG THE WEST PERIMETER CAN BE REMOVED AS SOON AS THE WALL UNDER CONSTRUCTION IS BUILT. 2) RE-ESTABLISH SEDIMENT CONTROLS AT OUTFALL ON EAST SIDE. 3) ESTABLISH A DESIGNATED CONCRETE WASH OUT PER YOUR SWPPP. |
|
07/19/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | PROVIDE A DESIGNATED CONCRETE/MATERIALS WASH OUT - BIRMED AREA TO KEEP MATERIALS IN ONE SPOT UNTIL IT CAN BE PROPERLY DISPOSED OF. | |
07/11/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) ADD WADDLE TO EXISTING WADDLE ALONG THE WEST PERIMETER. ADD SEDIMENT CONTROLS TO ALL AREAS ALONG THE PERIMETER THAT HAVE BEEN DISTURBED AND ARE NOT STABILIZED. 2) PROVIDE AN ESTABLISHED MATERIALS/CONCRETE WASH OUT PER YOUR APPROVED STORM WATER PLAN. FOLLOW UP INSPECTION ON A COMPLAINT FOR TRACKING ONTO RIVER ROAD: NO SIGNIFICANT TRACKING VISIBLE AT THE TIME OF INSPECTION. 3) CONTINUE TO SWEEP UP ENTRY AND EXIT TO SITE ON A ROUTINE BASIS IN ORDER TO REDUCE TRACKING ONTO RIVER. |
|
05/16/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) POST A SIGN WITH NOI, SITE CONTACT, BREIF DESCRIPTION, AND LOCATION OF SWPPP ON SITE. 2) PROVIDE STORM WATER MAINT. INSPECTIONS. 3) PROVIDE A DESIGNATED MATERIALS WASH OUT AREA WITH A SIGN. 4) INSTALL SEDIMENT CONTROLS ALONG THE EAST CHANNEL. |
|
04/04/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1) PROVIDE SEDIMENT CONTROL MAINT INSPECTION LOG PER YOUR SWPPP. 2) STABILIZE AREA BETWEEN (ROCK RETAINING WALL) AND FENCE OF ADJACENT PROPERTY WEST SIDE. 3) RE-ESTABLISH SEDIMENT CONTROLS AT SW CORNER TO SITE. |
|
03/23/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | RE-CHECK SPOILS FROM ROCK WALL CONSTRUCTION AT WEST SIDE OF DEVELOPMENT. CHECK SEDIMENT CONTROLS AT OUTFALL ON SW CORNER. |
|
02/28/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | 1) SEDIMENT CONTROLS HAVE BEEN PLACED ALONG PERIMETER AT NW CORNER. 2) CONTROLS HAVE BEEN RE-ESTABLISHED AT OUTFALL ON SW CORNER TO PROPERTY. 3) AS CONST. OF THE DRAINAGE CHANNEL IS COMPLETED YOU WILL BE REQUIRED TO PLACE SEDIMENT CONTROLS AT YOUR BOUNDRY TO PREVENT SOIL AND MATERIAL FROM ENTERING THE DRAINAGE CHANNEL. |
|
02/10/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORECTION NOTICE ISSUED, SUSPENSE DATE 24 FEB 06. 1) INSTALL SEDIMENT CONTROLS ALONG BOUNDRY AT NW CORNER OF SITE. 2) PLACE HAY BAILS OR EQUIVALENT AT OUTFALL TO DRAINAGE CHANNEL ON SW CORNER OF SITE. 3) INSTALL SEDIMENT CONTROLS ALONG FINISHED PORTIONS OF DRAINAGE CHANNEL ALONG EAST BOUNDRY. |
|
01/19/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | 1) ENSURE STORM WATER MAINT INSPECTIONS ARE ACCOMPLISHED AS STATED IN YOUR STORM WATER POLLUTION PREVENTION PLAN, AND INSPECTIONS ARE DOCUMENTED. 2) PROVIDE A DESIGNATED CONCRETE WASH OUT AREA WHEN APPLICABLE. 3) SHOW ANY CHANGES, REVISIONS, AND/OR ALTERATIONS MADE TO YOUR STORM WATER PLAN. 4) POST A COPY OF YOUR NOI AND/OR AZPDES AUTHORIZATION NUMBER IN A VISIBLE AND ACCESSIBLE LOCATION ON SITE. |