Inspection History Details
Inspection Status: Basin - Good
Inspection History: COT - BASN - Drainage/Basin - Annual Inspection - Recur
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2016 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 03/11/2015 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 06/23/2014 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | WEEDS NOTED IN THE BASIN AT THIS TIME. | |
| 05/20/2014 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | OVER GROWN. | |
| 05/03/2013 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 06/07/2012 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 03/28/2011 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | Basin in good cond. | |
| 03/21/2008 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | Basin in good cond. | |
| 03/15/2022 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | GOOD | |
| 04/12/2021 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | GOOD | |
| 11/10/2020 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Fair. Overgrown | |
| 12/09/2019 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 02/06/2019 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | minor overgrowth | |
| 03/07/2018 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 05/03/2017 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 02/08/2023 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | ||
| 11/29/2005 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | Veg. In basin needs to be removed. | |
| 02/07/2024 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | 1) Tree branches in basin. 2) 30’ x 20” RCP under sidewalk drain pipe is almost completely clogged up on the inlet side of the pipe. |
|
| 04/14/2025 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | Basin is along west side of main building south of west entrance. | |
| COT - BASN - Drainage/Basin - Annual Inspection - Recur | Scheduled | |||
| 04/18/2024 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Poor | This basin is very poor. The inlet of it is blocked with debris. And needs to be cleaned out. | |
| 05/01/2024 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Poor | Basin is full of debris and overgrowth | |
| 07/17/2025 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Poor | Basin is holding significant amount of water for more than 24 hours. Basins need to be maintained to infiltrate all water within 24 hours of a rain event. | |
| 07/31/2024 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Good | Basin is along west side of main building to the south of west entrance. | |
| 10/17/2025 | COT - BASN - Drainage/Basin - Annual Inspection - Recur | Basin - Fair | No change to basin since last inspection, shows signs of prolonged standing water, but is empty currently. |