Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/12/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :*/CORRECTIOINS MADE. 19 PSI AIR TEST FROM METER THRU BUILDING SERVICE ENTRANCE VALVE TO STOVE, WATER HEATER, AND FURNACE OK. GAS CARD AT METER. 889-1888 | |
| 12/30/2004 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :10PSI AIR TEST SHALL BE ON ENTIRE GAS SYSTEM AT TIME OF INSPECTION WITH NO PRESSURE DROP FOR 15 MINUTES PRIME AND TAPE ALL FITTING & TOOL MARK ON UNDERGROUND PIPING PIPE PRIME & 10 MIL TAPE UNDERGROUND PIPING SHALL BE ON FIRM BEDDING WHOLE UNIONS ARE NECESSARY RIGHT AND LEFT NIPPLES & COUPLINGS SHALL BE USED OR PROVIDE AGA OR CSA GAS VALVE THEN UNION AT BUILDING SERVICE ENTRANCE PROVIDE AGA OR CSA APPROVED GAS VALVES AT ALL APPLIANCES SECURE ALL PIPING PROPERLY PROVIDE 6" CLEARANCE FROM SINGLE WALL VENT OR 1" FROM DOUBLE WALL VENT AND CORRECT TRANSITION TO LARGER DUCT AT WATER HEATER WITH APPROVED CAP PROVIDE BONDING OF BUILDING GAS PIPING |