Inspection History Details
Inspection Status: Denied
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/24/2004 | PLUMBING - GAS PRESSURE TEST | Denied | IVRS - Inspection : See detailed listing on site.| 999*/NOT READY 1) PROVIDE BONDING OF BUILDING GAS PIPING 2) SCOTCH COAT PIPING MUST EXTEND 6" ABOVE FINISH GRADE MINIUMUM AT METER AND ALL TOOL MARKS SHALL BE PRIMED & WRAPED WITH 10 MIL TAPE. 3) CHANGES IN DIRECTION SHALL BE MADE WITH APPROVED FITTINGS. 4) PROVIDE RIDGID NIPPLE THRU FURANCE APPLIANCE HOUSING 5)GAS PIPING CANNOT BLOCK WATER HEATER SERVICE SPACE 6) WATER HEATER TEMPORATURE & PRESSURE RELIEF TO GRAVITY DRAW TO PAYLIGHT? 7) WATER HEATER TEMPURATURE & RELIEF TO BE SUBMERGED MINIMUM 4" INTO WATER HEATER TANK THIS MAY NOT BE A COMPLETE LIST |