Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESS TEST FNL
Permit Number - T04PL00925
Inspection Description - PLUMBING - GAS PRESS TEST FNL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/01/2004 | PLUMBING - GAS PRESS TEST FNL | Approved | 1) GAS PRESSURE TEST IS OK. 2) OK TO BACKFILL TRENCH. | |
05/27/2004 | PLUMBING - GAS PRESS TEST FNL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) GAS PRESSURE TEST WAS AT 0 LBS. 10 LB MIN. REQUIRED. 2) MUST REMOVE UNION IN GAS LINE AT SHUT OFF VALVE. 3) MUST PROVIDE AIR TEST ON ENTIRE SYSTEM. |