Permit: T04EL02353

Parcel: 136052380

Inspection Status: Denied

Inspection History: ELECTRIC - FINAL

Date Description Inspector Results Comments
11/30/2004 ELECTRIC - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
1) NEED AN ELECTRICAL UPGRADE PERMIT
2) INSTALL GROUNDING BUSHING AT OFF SET NIPPLE IN METER BASE
3) INSTALL ANTI-OXIDATION PASTE AT ALL ALUMINIUM TERMINATIONS
4) ALL PANEL PENETRATIONS NEED TO BE RAIN TIGHT ENTRYS WHERE HIGHER THAN THE BUS BAR ( 1/2" EMT AND 2" OFF SET NIPPLE)
5) SECURE 3/4" EMT FEEDING A/C PER NEC (ABOVE PANEL)
6) SEAL UNUSED PANEL OPENINGS (1/2" KNOCKOUT AT BOTTOM OF PANEL)
7) EXPOSE GROUND RODS (BOTH OF THEM)
8) BOND GAS PIPE TO ELECTRIC SERVICE
9) SECURE EMT WITHIN 3' OF LB
10) SEAL TIGHT SHOULD NOT BE USED IN LENGTHS GREATER THAN 6'