Inspection Status: Not ready for Inspection
Inspection History: ELECTRIC - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 05/07/2004 |
ELECTRIC - FINAL |
|
Not ready for Inspection |
IVRS - Inspection :* 1)FILL UNUSED OPENINGS IN PANELS 2)CORRECTLY TERMINATE GROUNDING EQUIPMENT CONDUCTOR AND IDENTIFY AS PER CODE. 3) WE HAVE MULTIPLE TERMINATIONS AT MAIN PANEL. 4) SEPARATE GOUNDS AND NEUTRALS AT SUB PANEL 250-24. 5) INSTALL CONDUCTORS IN FULL RACEWAY SYSTEM 6) TIGHTEN LOOSE FITTINGS. 7) correctly install junction box for cooler and use approved boxes for cooler connections. 8) install splice in junction box. |