Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/24/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :* 1) PLUMBING FINAL IS OK 2) OK FOR C OF O |
|
| 05/19/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* 1) HAVE ALL APPLIANCES INSTALLED AND HAVE CERTIFICATIONS FOR ALL IN HOUSE BACKFLOW DEVICES. 2) ALL INDERECT DRAINS TO BE SEPARATE OVER 5' TRAPPED & OVER 15' TRAPPED AND VENTED. 3) H20 SUPPLY TO BACKFLOW DEVICES TO BE FULL SIZE RIDGID PIPING. 4) MAKE WATER TIGHT FIXTURES. 5) ALL CLEANOUTS TO HAVE THREADED PLUGS WITH MATCHING SCREWS & CLEANOUT COVERS. 6) FLOW CONTROL TO BE VENTED CORRECTLY. 7) PROVIDE CORRECT TRANSITION FROM 2" TO 3' AT FLOW CONTROL. 8) SEPARATE CONDENSATE FROM DRAIN AT FRONT 3-COMP SINK LOCATION. 7) CORRECT DRAINAGE AT LAV. |