Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/04/2007 | ENGINEERING - FINAL | Approved | ||
| 05/30/2007 | ENGINEERING - FINAL | Partial Approval | Still need to complete items 6,7,9,10 and 12, items should be complete by 6/4. | |
| 05/24/2007 | ENGINEERING - FINAL | Partial Approval | Contractor needs to: 1- Remove trash enclosure from site by 5/31/2007. 3- Install bollards on side walls for trash enclosures. Per 6-01.4.2.C.2 4- Install sidewalk scupper for roof drains around building as required by section 2-08.5.1E of the City of Tucson Development Standards. 9- Provide letter from enginer in regards to Chapter XIV, Section 14.2 (7). Engineer need to certify drainage and detention basin. 10- Engineer needs to address existing basin on east side of project. Existing basin can no longer discharge. |
|
| 05/22/2007 | ENGINEERING - FINAL | Denied | Contractor needs to: 1- Remove trash enclosure. 2- Remove all stock piled materials from drive lanes. 3- Install bollards on side walls for trash enclosures. Per 6.01. 4- Install sidewalk scupper for roof drains around building. 5- Stabilize all areas disturb by construction. 6- Install bike parking. 7- Complete all rip rap work. Per detail 9 on sheet 4. 8- Construct spill way north side per detail 3 on sheet 5. 9- Provide letter from enginer in regards to Chapter XIV, Section 14.2 (7). Engineer need to certify drainage and detention basin. 10- Engineer needs to address existing basin on east side of project. Existing basin can no longer discharge. 11- Sweep all perimeter streets. 12- Remove staging area south of project (mobile mini storage units, trailer) and stabilize area. Spoke to Miguel in regards to issues. |