Inspection History Details
Inspection Status: Approved
Inspection History: BUILDING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2006 | BUILDING - FINAL | Approved | IVRS - Inspection :* | |
| 02/06/2006 | BUILDING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* 1) INSTALL BONDING JUMPER ACCROSS NON-METALLIC A/C BELOW ROOF MECH 2) RAISE PLUMBING VENTS ABOVE A/C UNIT FOR PROPER VENTING AND MECH VENT, ALSO NEED PAINT 3) INSTALL SAN-TEE AT VENT AND REDUCER TO TIE CONDENSATE DRAIN INTO ROOF VENT PIPE 4) INSTALL BRASS BACK FLOW PREVENTER VALVES ON HOSE BIBS-X4 5) CHANGE BOTTOM 20 AMP BREAKER TO 15 AMP 6) CAP KITCHEN SINK CLEANOUT 7) NEED ARC FAULT BREAKERS FOR BEDROOMS 8) SEAL TOILETS TO FLOOR |