Inspection Status: Approved

Inspection History: PLUMBING - ROUGH, SOIL

Date Description Inspector Results Comments
07/06/2005 PLUMBING - ROUGH, SOIL Approved IVRS - Inspection :* TURNED IN ( 1) COPY OF PDEQ GENERAL PERMIT CONFORMANCE/ APPROVAL OF CONSTRUCTION.
01/24/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :*MANHOLE #6 OK PONDING CITY APPROVED REVISED PLAN AND NOTES FROM 10/14/04
01/21/2005 PLUMBING - ROUGH, SOIL Partial Approval 4" SITE SEWER FROM MANHOLE #4 25' EAST TO NEW MANHOLE #6 YET TO BE POURED, 65' TO ?? CLEANOUT, 85' TO BUILDING 2 WAY CLEANOUT OK PENDING CITY APPROVED PLAN OF RED LINE DRAWIN OF THIS ON SITE AND NOTES FROM 10/14/04 INSPECTION
01/19/2005 PLUMBING - ROUGH, SOIL Partial Approval WATER TEST UNDERGROUND ONLY PER APPROVED PLAN OK.
01/12/2005 PLUMBING - ROUGH, SOIL Partial Approval 4" SEWER FROM 6" TO 5' FROM NORTH EDGE OF BUILDING #2 OK 4" SEWER FROM MANHOLE #4 EAST TO 1ST CLEANOUT OK PENDING NOTES FROM 10/14/04 INSPECTION
01/11/2005 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :* 6" SDR 35 FROM MANHOLE #4 NORTH TO C. O #3A OK 4" SDR 35 FROM 6" PRIOR TO C.O #3A WEST TO C.O.I.E 38.14 OK CONTINUES 40' WEST OK WILL NEED AIR TEST AT LATER DATE. 4" SDR 35 FROM MANHOLE #4 EAST TO C.O AT BUILD #3 I.E 41.30 REQUIRES FITTINGS FOR CHANGE OF DIRECTION
01/07/2005 PLUMBING - ROUGH, SOIL Not ready for Inspection IVRS - Inspection :*/1)PROVIDE APPROVED MATERIAL FOR STORM DRAINAGE PIPING WITHIN THE FOOT PRINT OF BUILDING 2)STORM DRAIN PIPING INSIDE BUILDING WILL REQUIRE WATER OR 5 PSI AIR TEST
10/14/2004 PLUMBING - ROUGH, SOIL Partial Approval IVRS - Inspection :* 8"PVC SDR 35 FROM MANHOLE #9 (EXISTING) TO MANHOLE #1 (NOW) & FROM MANHOLE #1 EAST APP 100' OK. PERMITS ALL W/ 03055 CALL OUT BCD 1-4. WILL NEED VERIFICATION OF GRADE ON ALL SITE SEWER. WILL NEED AIR PRESSURE TEST @ LATER DATE. WILL NEED VACUUM TEST @ LATER DATE. NEED PDEQ CERTIFICATE OF CONFORMANCE. NEED TO VIEW FLEXIBLE CONNECTION @ ALL MANHOLE BASE ENTRY & EXIT.