Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/04/2005 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 03/28/2005 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection : See detailed listing on site.| 999* NOT READY 1) POLE BASE WIRING INCLUDING J-BOXES TO BE FINISHED 2) AC DISCONNECT NOT TO BE IN FRONT OF UNIT. 3) COVER O/S PIPING ON GENERATOR. 4) INSTALL EPO SW.5) GENERATOR TEST RESULTS. 6) ALCALA GROUNDING PAPER. PLEASE HAVE CONTRACTORS TO DOOR START & STOP STATIONS, COVER J-BOX IN WASH ROOM? HAVE GENERATION OPEN TO CHECK CONNECTION. OK FOR TEMP C OF O |
|
| 03/24/2005 | ELECTRIC - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999* NOT READY 1) POLE BASES NOT FINISHED. 2) AC UNIT OUTSIDE NW CORNER DISCONNECT REQUIRES 3" IN FRONT OF AND CLEARANCE TO GRADE, THERO STAT. WIRING TO BE PROTECTED FULLY INTO BLDG. 3) 0/S PIPING TO OR NEAR GENERATOR NOT FINISHED. 4) WASHING MACHINE CIR NOT READY. 5) GARAGE DOOR START & STOP NOT READY. 6) RANGE HOOD NOT READY. 7) OPEN GENERATOR & PROVIDE TEST RESULTS 8) SUMP PUMP WIRING NOT IN. 9) AL?? GROUNDING DIAGRAM? ON ANTENNA GROUND. TOO MANY OTHER ITEMS NOT FINISHED. |