Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/15/2004 |
PLUMBING - ROUGH, SOIL |
|
Approved |
WRAP PIPING. CONTRACTOR WILL HAVE PHOTO'S OF ALL WRAPPED ABS AT NEXT INSPECTION |
| 10/13/2004 |
PLUMBING - ROUGH, SOIL |
|
Partial Approval |
IVRS - Inspection :*/WASTE & VENT WATER TEST UNDERGROUND ONLY OK TO 2' OUTSIDE BUILDING THESE (2) BUILDINGS. NO 2-WAY CLEANOUTS INSTALLED 1)CALL IN PRIOR TO POUR TO SEE CORRECT WRAP ON PIPING IN FOOTINGS AND THRU SLAB |