Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Search

Parcel Attributes
Parcel13817047C
JurisdictionTucson, Pima County
Water Course

Wash

City of Tucson ZoningR-2, O-3
Tucson WardWard 1
Tucson Registered NeighborhoodBarrio Nopal
Major Street & Route

Arterial or Collector

Pima County Data Assessor, Recorder, Treasurer, ...
Parcel Map Map
Parcel Attributes Issue?

Annexations & Original City Zoning (OCZ)

Address: 338 E ELVADO RD
Date - 12/19/2025 1:20 p.m.
Total Number Of Annexations & Original City Zoning (1)
Plan Description Annexation Ordinance Effective Date OCZ Ordinance
C9-60-39 West To Silverbell Road And South To San Xavier Indian Reservation 2014 2045

Rezoning Cases

Date - 12/19/2025 1:20 p.m.
Total Number Of Rezone Cases - (3)
Case No. Description New Zone Status Status Date
C9-85-84 H&R Ely - El Vado Road B-2A Closed 05/26/2010
C9-87-36 Ely - S. Nogales Highway B-2 Expired 12/16/2009
C9-87-36 Ely - S. Nogales Highway B-2A Expired 12/16/2009

Permits

Address: 338 E ELVADO RD
Date - 12/19/2025 1:20 p.m.
Total Number Of Permits - (52)
Permit Status Apply Date Expired Date Unit Type Description
TR-ROW-1223-01485 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01485 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal & Elvira neighborhoods including concrete work consisting of sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 1 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 2 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 3 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 1 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TR-ROW-1223-01487 Void 12/29/2023 N/A BLDG 4 UNIT 2 Right-of-Way (ROW) KE&G will be preforming milling and paving operations in the Barrio Nopal and Elvira neighborhoods including concrete sidewalk and ADA ramps.
TC-RES-0224-00612 Issued 02/02/2024 08/03/2024 BLDG 4 Residential Building - One or Two Family Gas and electrical reconnect
P98AN01750 ISSUED 07/16/1998 N/A ADDRNEW
T04BU02060 FINAL 08/18/2004 09/11/2005 GRADING GRADING:25 CY CUT/250 CY FILL
T04BU02685 FINAL 11/02/2004 08/28/2005 #03 SPKLR FIRE SPKR:ADD 8
T04BU02686 FINAL 11/02/2004 08/28/2005 #04 SPKLR FIRE SPKR:ADD 8
T04BU02687 FINAL 11/02/2004 08/28/2005 #05 SPKLR FIRE SPKR:ADD 8
T04BU02688 FINAL 11/02/2004 08/28/2005 #06 SPKLR FIRE SPKR:ADD 8
T04BU02689 FINAL 11/02/2004 08/28/2005 #07 SPKLR FIRE SPKR:ADD 8
T04BU02690 FINAL 11/02/2004 08/28/2005 #08 SPKLR FIRE SPKR:ADD 8
T04CM02033 C OF O 05/06/2004 08/31/2005 #03 COMBO NEW:DUPLEX
T04CM02034 FINAL 05/06/2004 08/31/2005 #05 COMBO NEW:DUPLEX
T04CM02035 FINAL 05/06/2004 08/31/2005 #07 COMBO NEW:DUPLEX
T04EL02028 FINAL 10/04/2004 04/05/2005 1M ELECT ADDITION:OWNERS PANEL FOR COMMON AREA
T04EX01049 CLOSED 11/04/2004 01/03/2005 EXCAV EXCAV:INSTALL 190LF OF ALL UTILITIES
T04OT01012 FINAL 05/20/2004 N/A FLOODPLN FLOODPLAIN USE PERMIT
T05EX00078 CLOSED 01/19/2005 03/20/2005 EXCAV EXCAV:INSTALL SIDEWALK & CURB CUTS 95LF
T06EL01417 FINAL 07/25/2006 01/24/2007 #06 ELECT ELECTRIC RECONNECT
T08EL00768 FINAL 04/30/2008 10/29/2008 #05 ELECT RECONNECT:ELECTRIC APT
T08PL00658 FINAL 04/21/2008 10/25/2008 #05 PLUMB GAS:RECONNECT APARTMENT
T11EL00649 FINAL 03/07/2011 09/05/2011 #07 ELECT RECONNECT ELECTRIC; DUP. #7
T11PL00201 FINAL 01/28/2011 07/31/2011 #07 PLUMB PLUMBING RECONNECT; APT #7
T15CM08950 FINAL 12/24/2015 06/25/2016 #04 COMBO ELECTRIC AND GAS RECONNECT
T17CM01399 FINAL 02/21/2017 08/23/2017 #04 COMBO ELECTRICAL RECONNECT
T98CM03185 FINAL 07/23/1998 06/29/1999 #01 COMBO DUPLEX
T98MS00017 ISSUED 08/24/1998 N/A MISC FLOODPLAIN #866
T99EX01350 CLOSED 11/16/1999 01/15/2000 EXCAV EXCAV:14LF OF CURB