Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/21/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* 1) PLEASE HAVE PLANS AND PERMIT AVAILABLE FOR EACH INSPECTION 2) CORRECTION MADE OK. WATER TEST ONE RISER TO 10 FEET OK 3) OK TO COVER |
|
| 04/18/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* SEE NOTE FROM 4/14/05 NO CHANGE WATER TEST DOWN. 1) PLEASE MAKE SURE YOUR PLUMBING IS READY BEFORE YOU CALL INSPECTION,OR POSSIBLY FACE RE-INSPECTION FEE. | |
| 04/14/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) AT P-4: REQUIRED TW TIMES THE PIPE DIAMETER (SIX INCHES) BETWEEN THE WEIR OF THE TRAP AND THE POINT OF VENT |