Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/18/2004 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :*/APPROVED 1)SOIL WATER TEST IS OK 2)OK TO BACKFILL TRENCH |
|
| 08/13/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :SOIL WATER TEST IS OK FOR ROUGH SOIL BETWEEN GRID #C TO D.5 AND 10 TO 8.5 SOIL WATER TEST IS OK FOR ROUGH SOIL BETWEEN GRID #C.2 - C.4 ON GRID LINE ONE OK TO BACKFILL TRENCH IN THESE AREAS ONLY |
|
| 08/07/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :*/ 1) SOIL WATER TEST IS OK 2) THIS INSPECTION IS FOR 6" BLDG DRAIN STUBBED INTO BLDG AND AT TWO WAY CLEANOUT 3) OK TO BACKFILL TRENCH |