Inspection Status: Approved
Inspection History: GRADING - INTERMEDIATE
Permit Number - T04BU02370
Inspection Description - GRADING - INTERMEDIATE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/11/2007 | GRADING - INTERMEDIATE | Approved | ||
03/30/2007 | GRADING - INTERMEDIATE | Partial Approval | WALKED SITE WITH LOU BOCK AND NEW SUPER BRIAN RECVD BASIN CERT -GROUT RIP RAP @ INLET -DUMPSTERS AND PORTA TOILET NEED TO BE REMOVED -SWEEP SITE =)~ |
|
03/28/2007 | GRADING - INTERMEDIATE | Partial Approval | CURSORY INSPECTION TALKED TO BILL KOCH ABOUT BASIN CERT REQUIREMENTS AND FINAL GRADING INSPECTION |
|
03/15/2007 | GRADING - INTERMEDIATE | Partial Approval | A ATLAS CLOSE TO BEING READY FOR FINAL GRADING LANDSCAPE WORK HAS BEEN DONE BASIN APPEARS TO BE COMPLETE SITE WORK IS SUBSTANTIALLY COMPLETE |
|
10/19/2006 | GRADING - INTERMEDIATE | Partial Approval | MET ONSITE WITH RON'S CONCRETE AND LOU BOCK ABOUT ON SITE RAMPS AND TRUNCATED DOMES | |
09/27/2006 | GRADING - INTERMEDIATE | Partial Approval | -TALKED TO SCOTT W/ DIV II BRAKEMAX GAVE HIM COPY TEMP C OF O PROCEDURE PAPERWORK -TALKED TO TERRY W/ DIV II CHUYS GAVE HIM A COPY OF TEMP C OF O PROCEDURE -TALKED TO LOU BOCK ON SITE ABOUT TRASH ENCLOSURES-MUST HAVE BOLLARDS ON ALL SIDES OF ENCLOSURES TO MEET DEVELOPMENT STANDARD 6-01.4.2.C.2 |
|
06/14/2006 | GRADING - INTERMEDIATE | Revision | PER PAUL MACHADO Subject: Chuy's on Houghton Creation Date 06/14/2006 7:24:32 AM From: Paul Machado Created By: Paul.Machado@tucsonaz.gov Recipients tucsonaz.gov DSPO2.CHDOM2 JFemlin1 CC (James Femling) LAlsham1 CC (Laith Alshami) MFlick1 CC (Matthew Flick) NKalaha1 (Nichole Kalahar) Nicole, I met with Matt F. and Tony Capp (Architect) concerning the refuse enclosure at this site. It seems that the grading plan has the service approach for the enclosure coming from the south and the development/site plan has the approach coming from the west. The preferred path is from the west. A revision to the grading plan is not warranted for this discrepancy. Thanks, Paul M. COT/DSD |