Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T04BU02370
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
04/11/2007 | STORMWATER FOLLOW-UP INSP | Approved | ||
01/26/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE 5 DAYS -SWEEP MEADOW WILLOW AT BOTH ENTRANCES AND AT HANDRAIL ON NORTH SIDE OF ROAD -SWEEP TRACK OUT FROM STORAGE FACILITY ONTO EXISTING SHOPPING CENTER |
|
01/11/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE WORK CONTINUES ON BOTH THE SHOPPING CENTER AND ON STORAGE FACILITY NO CONCERNS AT THIS TIME |
|
12/28/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CORRECTION NOTICE 7 DAYS UNCONTAINED CONSTRUCTION DEBRIS SITE MOSTLY STABLE |
|
10/05/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SITE WORK CONTINUING GETTING READY TO PAVE CONCRETE CUT OUT AND BOLLARDS BEING PLACED IN TRASH ENCOLSURES |
|
09/08/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SWEEP TRACK OUT ON MEADOW TRL AND IN ACE DRIVEWAY/PARKING LOT CALLED LOU BOCK. HE ADVISED DIGGUM WILL SWEEP |
|
08/29/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE WORK ONGOING APPROACHES HAVE BEEN PUT IN NO PAVING STARTED YET |
|
08/08/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | ALL SILT/MUD/ETC IS BEING CONTAINED ON SITE NO TRACK OUT |
|
08/02/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | STORMWATER CONTROLS APPEAR TO BE WORKING NO SIGN OF STORMWATER LEAVING SITE NO TRACK OUT AT THIS TIME NOT A COMPREHENSIVE SITE INSPECTION |
|
07/25/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. TRACK OUT ON HOUGHTON RD NEEDS TO BE SWEPT 2. CONCRETE WASHOUT-UNABLE TO LOCATE-UG UTILITY WORK HAS OPEN TRENCH-NO FULL SITE ACCESS CALLED LOU BOCK |
|
07/06/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | HEAVY TRACK OUT FROM SITE ONTO MEADOW WILLOW TRAIL SWEEP AND IMPROVE STABILIZED CONSTRUCTION ENTRANCE |
|
06/22/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE NOT IN GOOD SHAPE CONSTRUCTION DEBRIS ALL AROUND SITE CONCRETE WASHED OUT THROUGHOUT ENTIRE SITE SCE IS NOT SUFFICIENT TRACK OUT ONTO HOUGHTON NEEDS TO BE ADDRESSED AS WELL AS ON SUBDIVISION/ACE DRIVEWAY |
|
06/09/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | NO CONCERNS AT THIS TIME | |
06/02/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SITE IN BETTER CONDITION STILL NEED TO FOCUS ON SWEEPING |
|
05/22/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SITE IN BETTER CONDITION STILL NEED TO FOCUS ON SWEEPING |
|
05/16/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | CLEAN (SWEEP) ALL STREETS AND STREET CROSSINGS WHERE SEWER/WATER TIE IN COMPLETED-FOCUS ON NORTH ENTRANCE TO ACE FROM HOUGHTON CONTINUE TO SWEEP AT WATER METER LOCATION WITHIN DESERT WILLOWS SUBDIVISION CONTINUE TO MAINTAIN SEDIMENT CONTROLS AT INLET SCUPPER IN DESERT WILLOWS |
|
05/10/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | MET LOU BACH SPOKE TO MIKE ON SITE-THEY HAVE MOVED THEIR WATER METER INSIDE OF DESERT WILLOWS BMPS WILL HAVE TO BE PLACED AT SCUPPER TO PREVENT RUN-OFF/SEDIMENT FROM ENTERING BASIN |
|
05/08/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | ROCK HAS BEEN PLACED IN SCE TRACK OUT HAS BEEN ADDRESSED AND WILL BE AN ONGOING ISSUE AS H20 IS NOT AVAIL ON SITE YET AND WATER TRUCK MUST CROSS THE STREET TO FILL |
|
05/03/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | 1 SWEEP TRACK OUT 2 EXTEND STABILIZED CONSTRUCTION ENTRANCE CORRECTION NOTICE ISSUED TO MIKE WITH DIGGUM DIVISION II ON SITE ALSO FOR CHUY'S TERRY IS SUPER SOIL SYSTEMS IS ALSO ON SITE FOR PAD/SITE WORK |
|
04/24/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | MET WITH ERIC AT HOUGHTON/VALENCIA SITE 2 ADDITIONAL PADS TO BE BUILT AT THIS SITE NEED TO VERIFY PERMITS/GRADING PLANS |
|
04/05/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | ACTIVITY AT THIS SITE AGAIN FOUNDATION WORK BEING DONE TRACK OUT ON ROAD IS FROM WORK BEING DONE IN ROW |
|
02/01/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | TRACK OUT IS BEING MANAGED UTILITY INSTALLATION STILL ONGOING |
|
01/11/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SITE GRADING CONTINUES. TRACKING ISSUES HAVE BEEN RESOLVED. SWPPP CONTROLS IN PLACE AND APPEAR TO BE WORKING. |
|
12/02/2005 | STORMWATER FOLLOW-UP INSP | Approved | MET WITH ERIC ON SITE. DISCUSSED TRACKING IN ACE PARKING LOT. THERE IS AN AGREEMENT BETWEEN ACE AND SOIL SYSTEMS FOR SWEEPING. WATER STAND IN PLACE NOW WAITING ON ANOTHER HOSE. |