Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING PRE-CONSTRUCTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/23/2005 | ENGINEERING PRE-CONSTRUCTION | Approved | ||
| 12/30/2004 | ENGINEERING PRE-CONSTRUCTION | Correction Required | STORM WATER PRE-CONSTRUCTION MEETING: CORRECTIONS REQUIRED> 1) INSTALL SILT-FENCING AND STABILIZE CONSTRUCTION ENTRANCE ON MONDAY THE 3RD. 2) POST AZPDES FORM AT THE ENTRANCE OF THE SITE. RE-INSPECT ON TUESDAY THE 4TH. |