Inspection History Details
Inspection Status: Continued
Inspection History: STORMWATER FOLLOW-UP INSP
Permit Number - T04BU01737
Inspection Description - STORMWATER FOLLOW-UP INSP
Inspection Status - Continued
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
08/01/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME | |
05/01/2012 | STORMWATER FOLLOW-UP INSP | Continued | NO CONCERNS AT THIS TIME. | |
01/29/2009 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to stabilize site. | |
06/03/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to address SWPPP issues on site. Spoke to Jim Brooks in regards to. Pictures taken of site. | |
06/03/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to address SWPPP issues on site. Spoke to JIm Brooks in regards to. Pictures taken of site. | |
04/07/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to address SWPPP controls and clean site. | |
01/28/2008 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractror needs to: 1- Clean up drywall washout. 2- Clean up trash. 3- Provide wash out area. |
|
12/04/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Replace sand bags at basin inlet. 2- Replace concrete washout. 3- Clean wash out fron around building on northeast corner. 4- Pick up trash around site. Will e-mail |
|
10/31/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to make repairs to SWPPP controls and clean up wash out. | |
10/16/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to address: 1- Sand bags broken open at scupper inlet. 2- Clean wash out behind trailer. |
|
09/28/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Met on site with Joe and Jim went over SWPPP concerns for site. | |
09/04/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to keep controls in working order on all lots. | |
08/13/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor installed controls in basin inlet and sweep streets. Basin holding water for more then 24 hours. | |
07/24/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Re-install wattle around perimeter 2- Sweep streets. 3- Install controls in basin inlet. Sent e-mail to Joe in regards to issues. |
|
06/26/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean up sand in street. re-install controls in for basin inlet. Clean wash out from site. Sent Jim Brooks e-mail on 7-2-07. | |
06/08/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to replace inlet protection for basin. | |
05/14/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Install controls in inlet. 2- Clean up wash out around site. 3- Sweep sand out of street. |
|
04/19/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Site unchanged. Contractor need to address wash out on lots. E-mailed Jim Brooks in regards to wash out. | |
04/09/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean wash out dumped behind trailer. | |
04/03/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | No activity on site. If site to stay un-worked contractor will need to stabilize all areas disturbed | |
02/26/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Re-install sand bags in basin inlet. | |
02/01/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | No activity at this time. | |
01/09/2007 | STORMWATER FOLLOW-UP INSP | Partial Approval | Controls in place. | |
12/14/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor removed forms from site. | |
11/08/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor moved construction trailer on site. Contractor needs to clean up forms left on site. | |
10/19/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. | |
10/03/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor installed small trench around property for SWPPP controls. | |
09/19/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to install SWPPP controls. E-mailed Jim.brooks@cplc.org in regards to. | |
08/29/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Will meet Jim Brooks (882-0018) on site Wed. 8/30. Contractor needs to implement SWPPP controls. Current controls not working. | |
08/16/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor sweeping road. Contractor still needs to stake down wattle. | |
08/11/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to install controls per the SWPPP details. Clean all streets. Spoke to Jim Brooks with La Casa and Robin with Eagle rock in regards to issues. If issues not address I will issue N.O.V. | |
08/01/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Basin holding water. Contractor needs to clean streets. Contacted Robin with Eagle Rock (891-3023) in regards to issues. | |
07/17/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to install stormwater controls on south side of new raod. Soil run off into street. Spoke to Robin with Eagle Rock in regards to issue. | |
06/15/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Spoke to Gregg super with Eagle Rock, in regards to patching street and removing dirt pile from street. Gregg to get me a date when street will be patched. | |
06/01/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Spoke to Larry McGlone and Terry Spur in regards to installing controls on northwest corner (approx. 200' east) and a concrete wash out. Larry said when south side along alvoid is completed contractor will install a v-ditchfor controls. | |
05/17/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to clean Alvord and clean up all concrete wash out. Also provide wash out area. | |
05/03/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to restake wattle around site and sweep streets. Met Gregg site super (891-0972) on site and went over issues. | |
04/19/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to keep streets clean. | |
04/04/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Address: 1- Stake down wattle. 2- Keep streets clean. |
|
03/16/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Clean all streets. 2- Install construction entrance at entrance to project. |
|
03/06/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Spoke to Robin with Eagle Rock in regards to reinstalling construction entrances and moving cold patch out of right away. | |
02/16/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Spoke to Eagle Rock site super in regards to equipment running over waddle. Some waddle will need to be replaced. | |
02/07/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor installed waddle to replace silt fencing. | |
02/02/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to replace or repair stormwater controls around site. 2nd. notice. Contacted Robin (891-3023) with Eagle Rock at 0940. I explianed to Robin this was the second time the site has been in this condition. Eagle Rock needs to get controls back in working order and they needs to call in for a reinspection. If not I will issue a Stop Work Order or a citation for violation of the Stormwater Ordinance. Pictures taken of site. | |
01/19/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contacted Robin with Eagle Rock at 1255 hours, in regards to silt fencing down around site. Robin said he would get some one out there. Eagle Rock trenching for sewer. | |
01/04/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Need to watch silt fencing north side of project. | |
12/14/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Any problems with site contact Robin w/ Eagle Rock at 891-3023. Contractor needs to make repairs to stormwater controls around primeter of project. I spoke to Robin who said repairs will be made in 2 days. |
|
11/22/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to make repairs to stormwater controls around site. Approx. 175' of slit fencing down. Talked to Tim with Eagle Rock at approx 1245 hours. I informed him of controls being down around site. Tim said he would get someone over there today. | |
11/09/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to make repairs to stormwater controls, all side of project. Contacted Terry (891-3056) with Eagle Rock in regards to issues. Terry asked me to call Tim at 891-0972, about issues. I met Tim at Valle Hermoso wert over issues and gave Tim two copies of the Stormwater Ordinance. Eagle Rock is working on both Copper Vista and Valle Hermoso. |
|
10/25/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to repair stormwater controls around site. Spoke to David with Eagle Rock. David was on site unlaoding pipe. This was also discussed with Terry Spur on 10-11-05 |