Inspection History Details
Inspection Status: Approved
Inspection History: GRADING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/02/2005 | GRADING - FINAL | Approved | As-builts accepted for filing. | |
| 08/09/2005 | GRADING - FINAL | Cancelled | IVRS - RI canceled | |
| 08/08/2005 | GRADING - FINAL | Denied | 1. RE-DIRECT THE RAIN GUTTER DOWNSPOUT ON THE SOUTHWEST CORNER OF THE BUILDING TO DISCHARGE TO THE WEST. SEE E-MAIL FROM ACORN 3-4-05. 2. CORE DRILL THE SITE PERIMETER WALL TO PROVIDE POSITIVE DRAINAGE FROM THE BABIES 'R' US DOCK DRAIN SUMP TO THIS SITE'S PARKING AREA. 3. PROVIDE (4) FULL 8" x16" WALL OPENINGS IN THE EAST SITE WALL FOR THE ROOF DRAINAGE FROM THE PETCO BLDG. 4. CORRECT EROSION PROBLEM BETWEEN THE SITE WALL AND THE NORTHWEST CORNER OF THE PETCO BUILDING PAD. 5. PROVIDE A REVISED/AS-BUILT PLAN TO THE CITY OF TUCSON FOR MAPS AND RECORDS AND FOR THE FOLLOW-UP INSPECTION. |
|
| 08/05/2005 | GRADING - FINAL | Denied | PHOTOGRAPHED SITE DEFICENCIES AND MET WITH MATT FLICK TO REVIEW PHOTOS. | |
| 02/24/2005 | GRADING - FINAL | Denied | 1. PROVIDE DRAWINGS AND CALCULATIONS FOR THE 6' X 2'8" WALL OPENING MODIFICATIONS ON THE EAST PERIMETER. SUBMIT TO C.O.T. ENGINEERING DIVISION FOR APPROVAL. THE WALL OPENING IS RESTRICTED BY THE ADJACENT BUILDING'S FOUNDATION AND SIDEWALK AND WILL NOT ALLOW COMPLETE FLOW THROUGH THE WALL OPENING. 2. PROVIDE A REVISED AND APPROVED GRADING PLAN AND DRAINAGE REPORT THAT SHOWS ADDITIONAL WALL OPENINGS AT BABIES R US ROOF DOWNSPOUTS. |
|
| 12/20/2004 | GRADING - FINAL | Denied | 1. PROVIDE 13' CURB OPENINGS AT THE DRAINAGE ON THE DRIVEWAY BETWEEN LEXUS AND THIS PROJECT. 2. PROVIDE POSITIVE DRAINAGE FLOW FROM THE MAIN DRIVEWAY THROUGH THE TEST TRACK GROUTED ROCK RIP RAP. 3. COMPLETE ALL PAVING AND CURBS AS SHOWN ON THE GRADING PLAN. 4. PROVIDE SIDEWALK SCUPPERS AT ALL ROOF DOWNSPOUTS. 5. PROVIDE DRAWINGS AND CALCULATIONS FOR THE 6' X 2'8" WALL OPENING MODIFICATIONS ON THE EAST PERIMETER. SUBMIT TO C.O.T. ENGINEERING DIVISION FOR APPROVAL. THE WALL OPENING IS RESTRICTED BY THE ADJACENT BUILDING'S FOUNDATION AND SIDEWALK AND WILL NOT ALLOW COMPLETE FLOW THROUGH THE WALL OPENING. 6. CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS FROM THIS SITE AND THE ADJACENT LOT TO THE SOUTH THAT WAS DISTURBED DURING CONSTRUCTION ACTIVITY ON THIS SITE. |