Permit: T04BU00491

Parcel: 10408077C

Inspection Status: Approved

Inspection History: STORMWATER FOLLOW-UP INSP

Date Description Inspector Results Comments
02/24/2005 STORMWATER FOLLOW-UP INSP Approved
12/20/2004 STORMWATER FOLLOW-UP INSP Correction Required STABILIZE THE AREA SOUTH OF THIS PROJECT OR PROVIDE APPRORIATE SEDIMENT AND EROSION CONTROLS.

CLEAN-UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS FROM THE STORMWATER DRAINAGE CHANNEL.
07/15/2004 STORMWATER FOLLOW-UP INSP Correction Required 1. RESET SILT FENCE PER SWPPP DETAIL "A" OR MAKE MODIFICATIONS TO PROVIDE EROSION AND SEDIMENT CONTROL ON THE NORTH PERIMETER.
2. STABILIZED CONSTRUCTION ENTRANCE REQUIRES MAINTENANCE.
3. PROVIDE A DESIGNATED CONCRETE WASHOUT AREA.
4. POST THE NOI AND INFORMATION REGARDING THE SWPPP PER AZPDES REGULATIONS ON PAGE 19 SEC. J.