Case: T03VL00364

Parcel: 136380090

Inspection Status: Compliance

Inspection History: FOLLOW UP CODE VIOLATION

Date Description Inspector Results Comments
01/13/2004 FOLLOW UP CODE VIOLATION Compliance PERMITS OBTAINED FOR FIRE DAMAGE. CLOSE CASE PER INSPECTOR.
10/27/2003 FOLLOW UP CODE VIOLATION Violation OWNER IS REQUESTING AN EXTENSION TO 17 DEC. 03 REQUEST GRANTED.
10/03/2003 FOLLOW UP CODE VIOLATION Violation OWNER CALLED TO REQUEST ADDITIONAL TIME FOR HIS ARCHITECT TO COMPLETE THE PLANS. RE-SCHEDULE F.U. FOR 24 OCT 03.
09/19/2003 FOLLOW UP CODE VIOLATION Violation LEFT NOTE YOU ARE REQUIRED TO OBTAIN PERMITS FOR WRK THATS ALL READY DONE A CITATION WILL BE SENT ON 9-19-03 BY F. G. F/U 10/20/03.
09/03/2003 FOLLOW UP CODE VIOLATION Violation NOTICE OF VIOLATION ISSUED TO MAQSOOD & SABRINA AHMAD FOR NPO 9816 SEC 16-4 VIOL OF RECONSTRUCTION OF FIRE DAMAGED CARPORT WOP FOR THE STRUCTURAL PORTION. F/U 09/19/03
07/01/2003 FOLLOW UP CODE VIOLATION Correction Required 1) NO ONE HOME,
2) STORAGE ROOM AND CARPORT REBUILT,
3) UNKNOWN WHETHER OR NOT PERMITS WERE OBTAINED; ACTIVITY TRANSFERRED TO G-8
F/U 07/17/03
04/21/2003 FOLLOW UP CODE VIOLATION Violation T03EL ELECTRIC REPAIR/RECONNECT ISSUED 3/26/03. NO INSPECTION RECORDED.
2.) POWER ON/GAS OFF @ SITE DAMAGED ELEC. CIRCUITS DISCONNECTED.
3.) CARPORT HAS BEEN TORN DOWN. BUILDING IS SECURE. FU 60 DAYS. 7/01/03