Permit: T03PL01790

Parcel: 14024057C

Inspection Status: Denied

Inspection History: PLUMBING - FINAL

Date Description Inspector Results Comments
10/29/2003 PLUMBING - FINAL Denied IVRS - Inspection 0999*/ 1) MUST PROVIDE PRESSURE GAUGE WITH 1/10 TH INCREMENTS. 2) WHEN A MASTER METER HAS BEEN LOCKED BY S.W. GAS THEN A LICENSED PLUMBING CONTRACTOR WILL HAVE TO GO THROUGH EACH UNIT THAT IS SUPPLIED BY MASTER METER AND BEING ALL APPLIANCES AND SYSTEM TO CURRENT CODE. THEN I WILL INSPECT EACH UNIT FOR COMPLIANCE PRIOR TO RELEASE OF GAS CLEARANCE CACO. 3) MUST PROVIDE TAPE PRIMER AND APPROVED 10 MIL. TAPE ON JOINTS UNDERGROUND.