Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T03PL01751
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/03/2003 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000*/ INSPECTED AM, LEFT INSTRUCTIONS FOR CORRECTION. REINSPECTED AT 1:00 PM - CORRECTIONS MADE - OK FOR GAS. METER IS ON. OK TO ACTIVATE. | |
10/22/2003 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*/ 1) PLEASE PROVIDE GAS ISOMETRIC SHOWING DEVELOPED LENGTH AND BTU CONSUMPTION. 2) PLEASE INSTALL ALL PIPING AND MAKE ALL CONNECTIONS IN ORDER TO FINALIZE INSPECTION. | |
10/20/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*/ 1) PLASTIC PIPING SHALL HAVE MINIMUM 18" OF COVER. 2) PIPING OVER 14" WATER COLUMN IN PRESSURE SHALL BE TESTED AT 60 PSI. THIS MUST NOT BE A COMPLETE LIST |