Inspection Status: Denied
Inspection History: MECHANICAL - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 12/08/2003 |
MECHANICAL - FINAL |
|
Denied |
IVRS - Inspection 0999*/ 1) PROVIDE A ROOF JACK WHERE CONDENSATE DRAINS PENETRATE THE ROOF. 2) PROVIDE A PRESSURE TEST ON ALL NEW GAS PIPING. ½" GAS PIPE NOT ADEQUATE FOR 125,000 BTU, IF OVER 20'. 3) THE SHIELD OVER CANVAS CONNECTORS MUST COVER THE SIDES ALAO. 4) FRESH AIR INTAKE ON SOUTH UNIT IS TOO CLOSE TO A FLUE VENT PIPE. 5) PAINT EXPOSED PVC ON SIDE OF BLDG. AND SECURE TO WALL. EXTEND DRAIN TO WITHIN 6" OF THE DIRT. NEED ACCESS TO INSIDE OF BLDG TO SEE WHERE GAS IS CONNECTED. |