Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Case: T03DV00088

Parcel: 133033000


Addresses:

9855 E SPEEDWAY BL


Inspection Status: Compliance

Inspection History: NPO(DL)-VACANT & UNSEC.STRUCT

Case Number - T03DV00088

Inspection Description - NPO(DL)-VACANT & UNSEC.STRUCT

Inspection Status - Compliance

Date Description Inspector Results Comments
04/27/2004 NPO(DL)-VACANT & UNSEC.STRUCT Compliance STRUCTURES SECURED
VISITED SITE ON FOLLOW UP INSP. ALL STRUCTURES REMAIN SECURED AT THIS TIME. JUNK VEHICLE HAS BEEN REMOVED, DUE TO HISTROY OF PROPERTY CONTINOUSLY BEING BREACHED DNR INSPECTOR WILL DO 45 DAY FOLLOW UP.
03/09/2004 NPO(DL)-VACANT & UNSEC.STRUCT Violation STRUCTURE BREACHED
VISITED SITE ON FOLLOW UP INSPECTION. BOTH STRUCTRUES ON PROPERTY HAVE BEEN BREACHED AGAIN. SOUTHWEST STRUCTURE HAS WOODEN TUNG & GROOVE SIDING. A 3 FOOT BY 3 FOOT SECTION HAS BEEN TORN OUT TO GAIN ACCESS TO INTERIOR AS WELL AS SECTION BY NORTH WINDOW. FOUND BEDDING MATERIAL IN STRUCTURE.
NORTH EAST STRUCTURE HAS BEEN BREACHED AGAIN. SOUTH WEST CORNER WINDOW BORDING WAS REMOVED & OTHER WINDOW PLYWOOD BOARDING HAS HAD SECTION TORN OFF. LARGE AMOUNTS OF TRASH & DEBRIS STILL ON PROPERTY & INTERIOR OF MAIN STRUCTURE.SEVERAL ATTEMPS HAVE BEEN MADE BY PROPERTY MANAGER & CITY OF TUCSON BOARD UP CONTRACTOR TO SECURE STRUCTURE. WILL ADVISE INSP. II BEFORE PROCEEDING. PICTURES WERE TAKEN.
10/28/2003 NPO(DL)-VACANT & UNSEC.STRUCT Violation VISITED SITE ON FOLLOW UP INSP. FOUND BOTH STRUCTURES UNSECURED MAIN STRUCTURE HAD 1 3' X 4' BOARD RIPPED OFF AND SMALLER STRUCTURE HAD KITCHEN WINDOW BOARD PRYED OFF. WILL CONTACT BOARD UP CONTRACTOR TO SECURE UNIT. DO FOLLOW UP IN 30 DAYS. WILL INFORM INSP. II RICK SALDATE.
09/09/2003 NPO(DL)-VACANT & UNSEC.STRUCT Correction Required VISITED SITE ON FOLLOW UP INSP. MET BATHCRESS BOARD UP CONTRACTOR ON SITE, WENT OVER METHODS TO BE USED ON BOARD UP OF BOTH STRUCTURES. CONTRACTOR WILL USE 2" X 4" WITH CARRAGE BOLTS & 3/4" PLYWOOD ON ALL UNSECRUED OPENINGS. SECUREMENT OF STRUCTURES SHOULD BE COMPLETED BY THIS WEEK END ACCORDING TO CONTRACTOR.