Permit: T03CM05695

Parcel: 117120340


Addresses:

17 W CONGRESS ST


Inspection Status: Approved

Inspection History: ELECTRIC - PROGRESS

Permit Number - T03CM05695

Inspection Description - ELECTRIC - PROGRESS

Inspection Status - Approved

Date Description Inspector Results Comments
08/22/2006 ELECTRIC - PROGRESS Approved
01/05/2006 ELECTRIC - PROGRESS Denied IVRS - Inspection :
The wiring is not complete or does not comply with code.| 245*OK NEW CKT'S TO PROJECTORS ( # 8 40 AMP)
OK TO USE BUILDING FOR JAN 7 2006 EVENT ONLY
NOTE: MAKE SURE THERE IS NO OPEN WIRING IN AREA'S USED FOR EVENT.
01/04/2006 ELECTRIC - PROGRESS Denied IVRS - Inspection :
The wiring is not complete or does not comply with code.| 245*
1. PROVIDE PROPER CKT SIZE (#8) AND OVERCURRENT (40) TO PROJECTORS
2. CHECK BOX FILL FOR CONDUCTORS, APPEARS TO BE OVERFILLED SOME LOCATIONS.
3. WHERE YOU HAVE MORE THAN THREE CONDUCTORS IN RACEWAY-CHECK NEC 310.15
4. SECURE AND STRAP ALL RACEWAYS AS REQUIRED AND CLOSE ALL UN-USED OPENINGS IN EQUIPMENT.
5. READ THROUGH, NEC 540 AND 640 TO VERIFY PROPER INSTALLATION OF EQUIPMENT
6. PROPERLY IDENTIFY PANELS AND DISCONNECTS.
12/29/2005 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*CLOSE OFF ALL J-BOX'S AND OPEN WIRING IN ANY AREA THAT ARE ACCESSIBLE TO THE PUBLIC
INSTALL ALL DOORS ON AREAS THAT ARE NOT TO BE ACCESSED TO PUBLIC
EMERGENCY LIGHTS NORTHEAST ALLEY EXIT AND EXTERIOR ELECTRICAL ROOM NEED TO BE WORKING
12/23/2005 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*WALKED THROUGH W/RAY NOTE: DON'T FORGET GROUNDING AND BONDING FOR GENERATOR
12/22/2005 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*LOOKED AT BASEMENT LOBBY AND BATH AREA NOT READY FOR COVER AT THIS POINT
12/21/2005 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*OK 2ND FLOOR LOBBY & BATH CEILING AREA AFTER SLACK WIRES INSTALLED. LOOKED AT 2ND FLOOR LOBBY AND BATH CEILING AREA
NEED SLACK WIRES ON TRACK LIGHTING
EVERYTHING ELSE LOOKED OK
12/20/2005 ELECTRIC - PROGRESS Denied IVRS - Inspection :
The wiring is not complete or does not comply with code.| 245*
1. INSTALL PROPER SIZE FUSES IN A.C. DISCONNECTS
2. STRAP CONDUIT & FLEX AS REQUIRED.
3. REMOVE EMT TRIPPING HAZARD
4. GROUND ALL DISCONNECT ENCLOSURES
5. IDENTIFY RTU'S @ UNIT AND PANEL
12/19/2005 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*PANEL FEEDER OK
"TECH" "EM"
"TECH" "SA"
"EMB" "5B"
"B"
12/16/2005 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*OK PANEL 22
OK" DBA" OK TO CLOSE
12/14/2005 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
OK TO ENERGIZE TRANSFORMER "TI" AND "T2" AND SWITCHBOARD - "DPA AND "DPE"
NOTE: INSTALL GROUNDING ELECTRODE CONDUCTOR AND BONDING JUMPER CONDUCTOR UNDER SAME LUG - IN TRANSFORMER "TI"
12/13/2005 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*
PROGRESS IS GOOD NO INSPECTIONS READY TODAY
12/12/2005 ELECTRIC - PROGRESS Denied IVRS - Inspection :
The wiring is not complete or does not comply with code.| 245*
OK PANEL "CA" AND "CB" IN CATWALK - TRANSFORMER "T2" HAS UNDERSIZE EQUIPMENT GROUND (NEED 40)
TRANSFORMERS "T3" OK
TRANSFORMER "T1" HAS UNDERSIZE LOAD SIDE EQUIPMENT GROUND
12/07/2005 ELECTRIC - PROGRESS Partial Approval IVRS - Inspection :*
- PANEL "BL" IS OK TO ENERGIZE
- PANEL "2" IS OK TO ENERGIZE
- PANEL "MECH" HAS UNDERSIZED EQUIPMENT GROUND
- PANEL "MECH" OK TO ENERGIZE FOR THE PURPOSE OF BLOWING OUT DUCTS FOR SHORT PERIOD - THEN SHUT DOWN
- PROVIDE NEWLY APPROVED ELECTRICAL PLANS
- NEED TO REMOVE OBSTRUCTION IN FRONT OF PANELS
"PL" & "Z"
- NEED TO CHECK ALL FEEDERS AND EQUIPMENT GROUNDS
- NEED TO TIGHTEN ALL BONDING BUSHINGS AND LUGS
11/22/2005 ELECTRIC - PROGRESS Not ready for Inspection IVRS - Inspection :*PROGRESS GOOD, TALKED WITH ROB ABOUT SERVICE.