Permit: T03CM05695

Parcel: 117120340


Addresses:

17 W CONGRESS ST


Inspection Status: Approved

Inspection History: BUILDING - FINAL

Permit Number - T03CM05695

Inspection Description - BUILDING - FINAL

Inspection Status - Approved

Date Description Inspector Results Comments
08/29/2006 BUILDING - FINAL Approved IVRS - Inspection :*
STRUCTURAL & EGRESS COMPLETE
WAITING FOR PLUMBING FINAL
08/24/2006 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
FIRESTOP @ DOUBLE DOOR TO WEST BLOWER ROOM AS DISCUSSED.
06/28/2006 BUILDING - FINAL Denied IVRS - Inspection :
A reinspection fee has been assessed for this inspection. Multiple inspectio
1. NO PROGRESS SINCE LAST INSPECTION.
2. SEE NOTE 2, 3, 4 FROM 5/15/06
3. SEE NOTE 2 FROM 4/17/06 I WILL NEED TO INSPECT FIRESTOP.
4. SEE NOTE 1; 4/16/06
5. SEE NOTE 2; 4/4/06
6. SPECIAL INSPECTION REQUIREMENTS AS NOTED BY RANDY SCHULER IN E-MAIL TO PRINCIPALS ON 4/27/06 MUST BE MET.
7. YOU MUST PAY REINSPECTION FEE @ 201 N. STONE
05/16/2006 BUILDING - FINAL Denied IVRS - Inspection :
See detailed listing on site.| 999*
NOT READY/NO ACCESS
05/15/2006 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
1. SEE NOTES BELOW.
2. WORK MUST BE COMPLETE.
3. I AM STILL MISSING SPECIAL INSPECTION REPORTS NOTED ON 12/22/05
4. I HAVE NOT SEEN REVISED PLAN DELETING P.T. SLAB AT MECH YARD.
04/17/2006 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
1. I STILL NEED SPECIAL INSPECTION REPORTS REQUESTED IN DECEMBER OF 2005.
2. YOU NEED TO GET ALL TRADE INSPECTIONS FINALED.
04/04/2006 BUILDING - FINAL Partial Approval IVRS - Inspection :*
PROGRESS OK
03/07/2006 BUILDING - FINAL Partial Approval IVRS - Inspection :*
1. I CAN'T FIND WHERE BASEMENT WATER HEATERS WERE INSPECTED BY ELEC. OR PLUMB.
2. WHAT WITH NEW DROP CEILING IN SHOWERS? PLEASE PROVIDE TILE DATA SHEETS.
02/17/2006 BUILDING - FINAL Partial Approval IVRS - Inspection :*
IN REFERENCE TO CORRECTIONS NOTED 2/16/06
1. ALL FIRESTOP IS CURRENTLY IN PLACE
2. NON WATERPROOF LIGHT FIXTURES HAVE BEEN REMOVED WITH OUTLET SEALED WATERTIGHT OR SHOWER HEAD HAS BEEN CAPPED SO AS NOT TO BE USED.
3. SHOWER AREA WITH NON-WATERTIGHT J-BOXES CONDUIT AND EXPOSED DATA CABLES HAS BEEN CAPPED SO THAT SHOWER MAY NOT BE USED.
4. SEALS/SWEEPS FOR 2 HR DOORS HAVE BEEN INSTALLED
5. LIGHT BARS WITHIN 1" OF ABS HAVE BEEN PLUGGED WITHOUT BULBS
6. ALL DATA, JUNCTION, PULL ETC BOXES CLOSED.
02/16/2006 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
1) TCO OPERATIONS ARE ALL READY EXCEEDING WHAT I WAS TOLD WOULD BE HAPPENING. I DO NOT BELIEVE ANY EXPANSION OF THE TCC SHOULD BE ALLOWED. WE DO NOT AT THIS TIME HAVE ANY SINGLE AREA OF THIS PROJECT THAT IS COMPLETE
02/16/2006 BUILDING - FINAL Partial Approval IVRS - Inspection :*
02/14/2006 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
01/05/2006 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
1) SEE YESTERDAY'S NOTES
01/04/2006 BUILDING - FINAL Partial Approval IVRS - Inspection :*
FOR TCO TO SHOW MOVIES I WOULD LIKE TO SEE
1. ALL FIRE STOP IN OPEN DATA CONDUITS
2. FINISH ALL 3 HR FLOOR/CEILING SEPARATIONS
3. "WATCH YOUR STEP" SIGN OUT OF PROJECTION BOOTH
4. REFLECTIVE TAPE AT STEP NOSINGS OUT OF PROJ. BOOTH
5. REMOVE DEAD BOLT AT ENTRANCE OF BALCONY
12/30/2005 BUILDING - FINAL Partial Approval IVRS - Inspection :*
FOR SATURDAY NIGHT PARTY - TCO YOU NEED:
1. FINISH SEATING ASSEMBLY
2. REMOVE ALL SCAFFOLD, LADDERS, GENERATORS, BOXES, ETC. FROM AISLES, CORRIDORS AND SEATING AREAS.
3. REMOVE STRAP FROM STONE EXIT.
12/31/05 -- OK TCO FOR NEW YEARS PARTY
12/29/2005 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
PLEASE BE AWARE THAT ALL CORRECTIONS REQUESTED BY ANY INSPECTOR UP TO THIS POINT IN NO WAY REPRESENT A COMPLETE CORRECTION LIST. ALL ELECTRIC, PLUMBING, MECHANICAL AND BUILDING INSPECTORS HAVE BEEN FOCUSING ON GETTING JOB TO A POINT THAT THE C.O.T MAY FEEL COMFORTABLE FOR A TEMPORARY OPENING ON 12/31/05
12/22/2005 BUILDING - FINAL Partial Approval IVRS - Inspection :*1) I NEED SHOP DRAWINGS FOR A) FRP SYSTEM
B) ORCHESTRA LIFT
C) EJECTOR PIT
D) STAND BY GENERATOR
2) SPECIAL INSP REPORTS STILL REQUIRED A) PT SLAB B) WELDS AT MECH DECK AND ELECTRIC ??? AND PIPE SUPPORTS
C) INCOMPLETE H.S BOLTING
D) ALL SOILS REPORTS
E) HELICAL P???
F) BRICK REPAIRS
G) CATWALK SUPPORT
12/20/2005 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
12/19/2005 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
12/16/2005 BUILDING - FINAL Not ready for Inspection IVRS - Inspection :*
12/06/2005 BUILDING - FINAL Partial Approval IVRS - Inspection :*HAND RAILS EAST EXIT 2ND FLOOR, INTERMEDIATE RAILS. EAST EXIT CORRIDOR DOORS. HOUSE KEEPING GATER AT DEAD END. ( SERVICE REAR ON BUSINESS) NO EXIT TO BASEMENT
CHECK FOR FIRE TREATED