Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/22/2005 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
| 02/18/2005 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection :* 1) WEST TRUNK AB'S TESTED AND OK |
|
| 02/17/2005 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :* 1) NEED 10' TEST |
|
| 10/22/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | IVRS - Inspection :*/ 1) NEED LDO ON SITE FOR 1'-6" EAST SIDE YARD SETBACK 2) VERIFY FLOW OF SEWER IN ALLEY, FINISH FLR TOO BE 12" ABOVE UPSTREAM M/HOLE, 2ND STORY MAY REQUIRE A 2ND TRUNK LINE AND BACK WATER VALVE 3) BOTH PLUMBING GROUPS PLUMBED INCORRECTLY: DO NOT WET VENT 2ND AND 1ST FLOOR STACK, SEPERATE WASTE STACK FOR LAV., KITCHEN MAX 5' WITH 2" PIPE ON TRAP ARM. ANY JOINT BELOW SLAB TO BE SILVER SOLDER. 2ND PLUMB. GROUP EAST BATH, FITTINGS USED INCORRECTLY. TRY USING A COTTAGE ? IN BOTH BATH ROOMS. LAUNDRY COMBO OR WYE, DON'T USE SAN T, LYING FLAT ONLY VERTICAL. OVER 135 DEGREE REQURIES ADDITIONAL CLEANOUT ON SEWER LINE. NEED 10' H20 TEST ON DWV |