Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 12/08/2003 |
PLUMBING - FINAL |
|
Approved |
IVRS - Inspection 0000* |
| 12/05/2003 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ ALL CORRECTIONS MADE EXCEPT RPB FOR BOTTLE WASHER. |
| 12/04/2003 |
PLUMBING - FINAL |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 1) PLEASE INSTALL CLEAN OUTS PER PLAN ON ALL DRAINAGE PIPING. 2) PROVIDE C/O COVER IN R/O ROOM. 3) ICE MACHINE DRAINAGE SHALL BE SEPERATE. 4) ICE MACHINE REQUIRES BACKFLOW PROTECTION OR 1" AIR GAP ON H2O INLET. 5) BOTTLE WASHER REQUIRES BACKFLOW PROTECTION FOR SUBMERGED INLET ON H2O. |