Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
Permit Number - T03CM04529
Inspection Description - PLUMBING - ROUGH, SOIL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/01/2004 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection :* | |
05/28/2004 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999* |
|
05/26/2004 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection : See detailed listing on site.| 999*/ 1) WET DIRT AT CLEANOUTS ON NORTH SIDE 2) NO WATER IN 10' STACK 3) SOUTH ABS DOES NOT MATCH PLAN |
|
04/29/2004 | PLUMBING - ROUGH, SOIL | Not ready for Inspection | NO PLANS ON SITE, CALLED DAVID. PLANS ARE INSIDE THE BLDG IT'S LOCKED, HE SAID HE COULDN'T COME OVER TO OPEN DOOR, WILL RECALL 2) INCORRECT FITTINGS AT DOUBLE COMBO CLEANOUTS. YOU NEED TO CHANGE OUT THE COMBO TO A LONG SWEEP 90 DEGREE, INSTALL A 3 X 3 X 2 COMBO. ATTACHED TO HORIZONTAL DRAIN LINE, SOUTH OF 90 DEGREE. YOU WILL NOT BE ABLE TO SNAKE THRU. C.O. THE WAY OYOU HAVE IT SET UP | |
04/26/2004 | PLUMBING - ROUGH, SOIL | Partial Approval | IVRS - Inspection : See detailed listing on site.| 999*/ 1) 30 LF OF 3' ABS OK TO COVER LEAVE STACK AT SOUTH END AND 1 FEET FROM NORTH COMBO EXPOSED EAST WEST DRAIN ON NORTH SIDE OF HOUSE FROM N.E. CORNER OF EXISTING TO SEWER CONNECTION OK TO COVER. LAUNDRY AND BATHROOM PLUMBING AT EACH END OF DRAIN NOT INSTALLED |