Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/03/2006 | ELECTRIC - FINAL | Approved | IVRS - Inspection :* | |
| 11/02/2006 | ELECTRIC - FINAL | Denied | IVRS - Inspection : There is no access to the site.| 920* 1) BLDG LOCKED, COULD NOT RETRIEVE MESSAGE, IVR SYSTEM DOWN 2) RECALL INSPECTION-PLEASE HAVE ELECTRICAL CONTRACTOR ON SITE |
|
| 10/31/2006 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* EM LIGHT MISSING ON NORTH END SEE NOTES INSP. 10/6/06 |
|
| 10/20/2006 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
| 10/16/2006 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* | |
| 10/06/2006 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* 1. LETTER NOT ADDRESSING FIELD INSTALLATION BY CONTR. CIRCUITING NOT PER PLAN. 2. FINAL SUBJECT TO POWER CHECK OF EMERGENCY LIGHTING & LETTER FOR GFI CIRCUITING. |
|
| 10/05/2006 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* - OK BONDING & GROUNDING - PROVIDE LETTER FROM ARCH. FOR CIRCUIT ARRANGEMENT FOR GFI OUTLET ARRANGEMENT ON ROOF. PROVIDE DISCONNECT FOR WATER HTR. RECEIVED LETTER OF TORQUE FOR SES. |
|
| 08/23/2006 | ELECTRIC - FINAL | Not ready for Inspection | IVRS - Inspection : 1. REVISE PLANS FOR SES EQUIP. 2. BOND BLD. STEEL, WATER, GAS 3. DAISY CHAINED BONDING AT GROUND BUSHINGS TO SMALL CONDUCTORS, USE 250-6C TABLE FOR SIZING. |
|
| 08/17/2006 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection :* NOTES: 1. HAVE ELECTRICAL CONTR, PROVIDE LETTER OF TORQUE FOR SES EQUIP. ALSO OPEN ALL EQUIP. FOR INSPECTION. 2. VERIFY ALL INTERIOR GROUNDING & BONDING 3. PROVIDE ACCESS TO ROOF. |