Inspection Status: Approved
Inspection History: EXCAVATION/LAYOUT REBAR & ZON
| Date |
Description |
Inspector |
Results |
Comments |
| 02/06/2004 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Approved |
IVRS - Inspection 0000* |
| 09/10/2003 |
EXCAVATION/LAYOUT REBAR & ZON |
|
Denied |
IVRS - Inspection 0999*/ 1) REBAR DRIVEN INTO GROUND CANNOT BE TIED DIRECTLY TO STRUCTURAL HORIZONTAL REBAR 2) APPROVED 2-WAY CLEANOUT REQUIRED OUTSIDE OF WALL LINE 3) PVC PIPING NOT ALLOWED UNDER SLAB FOR WATER LINES 4) UNWRAP, UNCOVER ALL PIPING; COMPLETE TO PLAN, CODE, WATER TEST 5) NEED APPROVED FITTINGS CONNECTED INTO CLAY SEWER LINE 6) NO PLANS/PERMIT 7) STOPPED INSPECTION 8) CORRECT/COMPLETE AND RECALL 9) SUGGEST OBTAINING LICENSED PLUMBER TO COMPLETE PLUMBING |