Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/06/2009 | ENGINEERING - FINAL | Approved | ||
| 09/30/2009 | ENGINEERING - FINAL | Partial Approval | SEE ALL PREVIOUS COMMENTS FOR THIS SITE. LOOKED OVER THE SITE, CONSTRUCTION IS IN THE PROCESS ON THE TWO NEWEST BUILDINGS. THIS SITE IS NOT READY BUT HAS NOT CHANGED IN A MANNER THAT SHOULD AFFECT THE CURRENT TEMPORARY C OF O. THE GRADING FOR THIS SITE WILL BE CHECKED ONCE ALL OF THE EXTERIOR WORK HAS BEEN COMPLETED IN THE NEW CONSTRUCTION AREAS. I WILL ADVISE THE PROPERTY OWNER THAT ALL AREAS THAT ARE UNDER CONSTRUCTION ADJACENT TO PEDESTRIAN ACCESS AREAS WILL NEED TO BE PROTECTED TO PREVENT PUBLIC ACCESS. |
|
| 02/07/2006 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O APPROVED. FINAL WILL BE GIVEN BY DAVE ROBERTS | |
| 01/13/2006 | ENGINEERING - FINAL | Partial Approval | TO BE APPROVED BY D ROBERTS ONLY. | |
| 12/21/2005 | ENGINEERING - FINAL | Correction Required | MET ON-SITE WITH SAM O'SHAUGHNESSY TO DISCUSS THE WORK THAT WILL BE REQUIRED PRIOR TO THE ISSUANCE OF A TEMPORARY C OF O. HE GAVE ME A COPY OF THE RESPONSE TO ALL OF THE ITEMS THAT HAVE BEEN PREVIOUSLY ADDRESSED, SOME OF THESE RESPONSES WILL HAVE TO BE APPROVED BY THE ENGINEERING AND ZONING REVIEWER FOR THIS SITE BEFORE A TEMPORARY C OF O CAN BE ISSUED. THIS COPY OF THE COMMENTS HAVE BEEN PLACED WITH THE INSPECTION RESULTS FOR THIS DATE. I HAVE ALSO TAKEN PHOTO'S OF THE SITE TO SHOW THE CURRENT CONDITIONS OF THE SITE AS OF THIS DATE. THESE PHOTO'S HAVE BEEN GIVEN TO THE DEPARTMENT HEADS OF ZONING AND ENGINEERING TO HELP WITH THIER DECISION ON WHAT IS TO BE DONE WITH THIS SITE AT THIS TIME. | |
| 12/20/2005 | ENGINEERING - FINAL | Correction Required | CHECKED THE SITE AND FOUND THAT ONLY A FEW OF THE PREVIOUS COMMENTS HAD BEEN ADDRESSED. THIS SITE IS STILL NOT READY AT THIS TIME TO ALLOW ANYONE OTHER THAN CONTRACTOR PERSONNEL WITHIN THE PROJECT LIMITS. | |
| 10/21/2005 | ENGINEERING - FINAL | Denied | 1. SUBMIT A PHASED GRADING AND SITE PLANS FOR REVIEW AND APPROVAL BY THE CITY OF TUCSON ENGINEERING AND ZONING DIVISIONS. 2. PROVIDE A LETTER OF CERTIFICATION FROM AN ARIZONA REGISTERED PROFESSIONAL ENGINEER THAT STATES THAT THE PROJECT AND RETENTION/DETENTION BASINS HAVE BEEN CONSTRUCTED IN ACCORDANCE WITH THE APPROVED PLANS. 3. PROVIDE THE CORRECT FINISHED FLOOR ELEVATION FOR BLDG. "A". 4. RE-CONSTRUCT THE STEEP ACCESS RAMP ON THE SOUTHEAST CORNER OF BLDG. "A", AND PROVIDE BARRICADE RAILING AT THE TOP OF THE RETAINING WALL. 5. CONSTRUCT THE SOLID WASTE TRASH ENCLOSURE AT SOUTHEAST CORNER OF SITE. 6. PROVIDE 5' AND 6' MASONARY SCREEN WALLS AND 42" BARRICADE RAILING ON THE SOUTH PERIMETER OF THE SITE. 7. CONSTRUCT THE SIDEWALK AND CURB ON THE NORTH SIDE OF THE BUILDING AS SHOWN ON THE PLAN. PROVIDE 2.5' OF VEHICLE OVERHANG AND 4' OF CLEAR PEDESTRIAN ACCESS ON SIDEWALK. 8. PROVIDE 6" CURBING ON THE INTERIOR PERIMETER OF THE SITE. THE 3.5" CURBS THAT HAVE BEEN CONSTRUCTED ARE NOT PER PLAN SPECIFICATIONS. ADDRESS THE ELEVATION DROP AT THE NORTHEAST CORNER OF BLDG. "C". 9. CONSTRUCT RETENTION/DETENTION BASINS AND THE SWALE ACROSS THE DRIVEWAY AS SHOWN ON THE PLAN. 10. PROVIDE (7) 4' INLETS TO BASIN #1, (6) 2' INLETS TO BASIN #2, AND THE INLET SIDEWALK SCUPPER TO BASIN #3. 11. PROVIDE CURBING AND COMPLETE ASPHALT PAVING ON THE NORTH PERIMETER OF THE SITE. 12. REMOVE TREES AND CURBING LOCATED IN THE PARKING AREA ACCESS LANE (PAAL) AND THE PARKING SPACES. (4) TREES LOCATED IN THE PAAL; (13) TREES LOCATED IN PARKING SPACES; THE TREES AT THE SOUTHWEST CORNER OF BLDG. "A" THAT BLOCK THE SIGHT VISIIBILITY TRIANGLE; TREES THAT CONFLICT WITH 2.5' VEHICLE PARKING OVERHANG. 13. PROVIDE DRAINAGE UNDER SIDEWALKS FOR THE ROOF DRAINAGE ON THE EAST AND SOUTH SIDES OF BLDG. "A" AND AT THE SOUTH END OF RETENTION/DETENTION BASIN #3. 14. PROVIDE SLOPE STABILIZATION AT NORTH PERIMETER OF BLDG. "A", AT TEP TRANSFORMER PAD, AND ON THE BANKS OF THE RETENTION/DETENTION BASINS. NOTE: 1:1 SLOPES REQUIRE GROUTED ROCK RIPRAP, 2:1 SLOPES REQUIRE HAND PLACED ROCK RIPRAP ON FILTER FABRIC. 15. CLEAN UP AND REMOVE ALL CONSTRUCTION MATERIAL AND DEBRIS. |