Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/14/2005 | PLUMBING - FINAL | Approved | IVRS - Inspection :*ALL CORRECTIONS HAVE BEEN MADE OK FOR C OF O |
|
| 12/12/2005 | PLUMBING - FINAL | Denied | IVRS - Inspection : See detailed listing on site.| 999*SHALL PROVIDE A PROPER DRAINAGE FITTINGS ( L-SWEEP) FOR HORIZONTAL TO HORIZONTAL DRAINAGE @ HAND SINK TRAP ARM @ BAR. SHALL PROVIDE ( L-SWEEP) FOR DEEP SINK AND PROVIDE A P-TRAP AND SECURE WITH APPROVED STRAPS SHALL LOCATE THE GAS VALVE FOR OVEN WITHIN 3' OF REGULATOR SHALL SECURE WATER SUPPLY DROP FOR WATER SOFTENER SHALL PROVIDE A C.O FOR MENS URINAL C/L ON DISCHARGE TUBE FOR URINAL SHALL BE A MIN. OF 6" ABOVE THE TOP OF FIXTURE. SHALL PROVIDE C.O COVERS AND PLUG. FOR TWO WAY C.O. SHALL PROVIDE VACUME BREAKERS @ ALL EXTERIOR HOSE BIBS SHALL SEAL T & P DRAIN PENETRATION @ SOUTH WALL SHALL LOCATE BACKFLOW PREVENTER WITH TEST APPTS. LOOKING UP. SHALL SECURE AND CAULK ALL SINKS TO WALL SHALL PROVIDE DIRECTIONAL FITTINGS FOR TRIPLE COMT.SINK @ WEST WALL IN BAR. |
|
| 11/21/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :*NOT READY | |
| 09/20/2005 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection :* |