Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T03CM02534
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/21/2003 | PLUMBING - FINAL | Approved | IVRS - Inspection 0000* | |
| 12/16/2003 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*/ 1) SEE 610.3 OF 94 UPC, PIPE ½" APPROVED MATERIAL [COPPER] FROM SOURCE H20 TO RPB DEVICES. 2) P-13 135o CHANGE OF DIRECTION REQUIRES CLEAN OUT. 3) PLEASE HAVE ALL RPB REPORTS ON SITE AT NEXT INSPECTION. | |
| 12/11/2003 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*/ 1) P8 REQUIRES CORRECT DRAINAGE FITTING ON DRAIN ARM. 2) COFFEE MACHINE AND ICE TEA MACHINE REQUIRE RPB PROTECTION OR PROOF OF 1" AIR GAP ON H2O SUPPLY. 3) ESPRESSO MACHINE REQUIRES RPB OR PROOF OF 1" AIR GAP ON H20 SUPPLY. 4) INDIRECT DRAIN FOR ESPRESSO MACHINE REQUIRES SUPPORT AT SINK AND 1" AIR GAP. 5) P-13 REQUIRES CLEANOUT FOR OVER 135o CHANGE OF DIRECTION AND APPROVED DRAINAGE FITTINGS. 6) ICE MACHINE WILL REQUIRE 2 SEPARATE DRAINS TO FLOOR SINK WITH 1" AIR GAP. 7) FUTURE CARBONATE WILL REQUIRE RPB PROTECTION. |