Inspection History Details
Inspection Status: Approved
Inspection History: ENGINEERING - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/29/2008 | ENGINEERING - FINAL | Approved | Approved | |
| 01/07/2005 | ENGINEERING - FINAL | Partial Approval | TEMPORARY C OF O. 1) PROVIDE SIDEWALK SCUPPERS FOR POSITIVE DRAINAGE UNDERNEITH SIDEWALK LOCATED IN FRONT OF THE ENTRANCE ON EACH SIDE OF THE BUILDING. 2) PROVIDE POSITIVE DRAINAGE, (VIA SWALE), TO THE SIDEWALK SCUPPERS. |