Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - FINAL
Permit Number - T03CM01030
Inspection Description - PLUMBING - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/31/2003 | PLUMBING - FINAL | Approved | CORRECTIONS HAVE BEEN MADE AS PER LAST REQUEST. | |
10/29/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*/ 1) ALL EXTERIOR CLEAN OUTS TO BE CUT DOWN TO GRADE AND APPROVED COVERS INSTALLED. 2) DISHWASHER DRAIN HOSE TO BE SECURED AT DRAIN BOARD HIEGHT. 3) VENT SYSTEMS FOR WATER HEATERS NOT SECURED ADEQUATLY. 4) NO NOTICE IN ELEC. SERVICE PANEL ABOUT PEX WATER PIPE. | |
10/28/2003 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*/ 1) NOT READY FOR INSPECTION. CUT ALL EXTERIOR CLEAN-OUTS TO GRADE. INSTALL CLEAN OUT ADAPTORS W/PLUGS. 2) DID NOT ENTER RESIDENCE. | |
09/16/2003 | PLUMBING - FINAL | Denied | IVRS - Inspection 0999*/1) SEE 103.5.4.2 94 UPC IT IS THE RESPONSIBILITY OF # THE HOLDER OF THR PERMIT TO INSURE THE WORK IS READY BEFORE CALLING INSPECTION. | |
09/15/2003 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*/1) SEWER/HCS APPROVED IN ERROR ON 4-17-03. NO INSPECTION HISTORY. THIS INSPECTION IS FOR SEWER/HCS - OK . OK TO COVER. 2) PLUMBING CONTRACTOR TO EXTEND CHANGE OF DIRECTION CLEAN-OUT TO GRADE. 3) OK TO COVER. | |
09/12/2003 | PLUMBING - FINAL | Not ready for Inspection | IVRS - Inspection 0000*/ 1) PLEASE COMPLETE WORK BEFORE CALLING 2) WHEN CALLING FOR SITE SEWER PLEASE PROVIDE WATER TEST |