Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 01/22/2004 |
PLUMBING - INTERMEDIATE |
|
Approved |
IVRS - Inspection 0000*/ WTR TEST WASTE AND VENT THRU ROOF APPROVED. H20 60 PSI TEST APPROVED. WILL NEED TO SEE CLOSET FLANGES PRIOR TO SETTING STOOLS. |
| 01/21/2004 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 01/20/2004 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection 0000* |
| 01/16/2004 |
PLUMBING - INTERMEDIATE |
|
Not ready for Inspection |
IVRS - Inspection 0000*/ 10 PSI PRESSURE TEST ON GAS PIPING FROM METER TO ROOF TOP UNIT AND DRYER LOCATION APPROVED. PIPING TO SECURED USING APPROVED CLAMPS. 1) PROVIDE C/O AT UPPER STOOL. 2) SUPPORT ALL PIPING WITH APPROVED DEVICES. 3) USE FITTING APPROVED FOR DRAINAGE. 4) YARD WATER TO HAVE PRESSURE TEST. 5) H20 IN BLD TO BE PRESSURE TESTED. 6) H20 HOT AND COLD TO HAVE SEPERATION. 7) ALL DRAIN ARMS TO HAVE ΒΌ" PER FT FALL. |