Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER INSTALL OF CONTROLS
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/05/2006 | STORMWATER INSTALL OF CONTROLS | Approved | AFTER RESEARCH INTO YOUR INITIAL SUBMITTAL AND REVIEW OF YOUR GRADING PLAN FOR THIS SITE, IT HAS COME TO MY ATTENTION THAT THE SITE IS REQUIRED TO HAVE A SWPPP AS STATED IN THE REVIEW COMMENTS DATED DEC 12TH, 2003. IN FACT WE HAVE A COPY OF YOUR APPROVED SWPPP ON FILE, WITH A SIGNED NOI. YOU MUST MEET ALL REQUIREMENTS STATED IN YOUR APPROVED SWPPP, DATED 6/23/04. | |
| 01/04/2006 | STORMWATER INSTALL OF CONTROLS | Approved | SWPPP NOT REQUIRED. SEDIMENT CONTROLS IN PLACE. 1) MAINTAIN CONTROLS AS NEEDED TO PREVENT OFF SITE MIGRATION OF SOIL. 2) SWEEP UP TRACKING OFF OF ADJACENT PUBLIC ROADWAYS. 3) CALL FOR INTERMEDIATE/FINAL GRADING INSPECTIONS PRIOR TO C OF O'S. |
|
| 12/21/2005 | STORMWATER INSTALL OF CONTROLS | Correction Required | 1) SCHEDULE STORM WATER PRECONSTRUCTION MEETING IN ORDER TO DISCUSS STORM WATER MANAGEMENT AND RESPOSIBILITIES. 2) SWPPP NOT REQUIRED DUE TO THE FACT THAT THE PERMIT IS 3 YEARS OLD AND THE REQUIREMENT FOR A SWPPP WAS DISTURBANCE OF 5 ACRES AND LARGER AT THE TIME OF ISSUANCE; HOWEVER SEDIMENT CONTROLS MAY BE REQUIRED FOR THE SITE. 3) SEDIMENT CONTROLS HAVE BEEN INSTALLED ON SITE, (SILT FENCE, WADDLE, STABILIZED CONSTRUCTION ENTRANCE). 4) PROVIDE A POINT OF CONTACT, ( SITE SUPERINTENDENT OR EQUIVALENT) IN ORDER TO DISCUSS INSPECTION RESULTS. |