Inspection History Details
Permit: T03BU01937
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/09/2009 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 01/25/2007 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Address basin holding water for more then 24 hours. 2- Stabilize allo areas distrubed by construction. Spoke to Brain on site in regards to items. |
|
| 12/22/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to: 1- Clean material off HC ramps, westside of project. 2- Clean wash out next to 1309 Woodbine Ln. Spoke to Ron with KB Homes in regards to issues, also the need to stabilize all areas distrubed by construction. |
|
| 12/11/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to clean spoil materials off HC ramp northwest corner of project and clean wash out from lot 57. | |
| 10/30/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | SWPPP Maintenance on site cleaning. | |
| 10/06/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to: 1- Clean streets. 2- Clean up wash out northwest corner of project. Left message for super via cell phone. Did not receive call back. Left copy of inspection on supers desk. |
|
| 09/25/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor installed controls around perimeter of project. Contractor needs to stop drywall sub from wash out all over site. Supply wash out area and ensure use. | |
| 09/05/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | SWPPP maintenance started working on controls around perimeter of site. If controls are not finished by 9/6/06 AM, will issue Stop Work Order. | |
| 08/31/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued Correction Notice. Contractor has 4 days to reinstall controls around perimeter of perject. If contractor doesn't install controls a stop work order or notice of violation will be issued. | |
| 08/16/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to: 1- Rip Rap all slpoes 2 to 1 and steeper. 2- Repair concrete wash out. 3- Re-install all controls until areas have been stabilized. |
|
| 08/03/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to address: 1- Erosion at 1255, 1267, 1280, 1305, 1317 Flaxseed. 1270, 1342, 1330, 1318, 1306, 1291 Burdock. 2- Install check dams and clean wash out in concrete channel westside of project. 3- Complete rip rap work northside of 1291 Burdock. 4- Address erosion north side of project. Spoke to site super in regards to issues. |
|
| 07/20/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Repair concrete wash out. (2nd. notice) Spoke to asst. super in regards to item. |
|
| 06/21/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Spoke to site super in regards to: 1- Repairing concrete wash out. 2- Cleaning up wash out on the west side of project. 3- Cleaning up drywall wash out around lot 5. |
|
| 06/08/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Repair concrete wask out area and keep streets clean. | |
| 05/24/2006 | STORMWATER FOLLOW-UP INSP | Not ready for Inspection | E-mail sent to Bob Mallory on 5/24/06 at 0740. Hey Bob, Just wanted to send you a quick note in regards to SWPPP issues. The last couple of months things have started to head down hill. I was at Starr Pass Heights yesterday and issued a Correction Notice, gave the super 3 days to get things cleaned up or I will issue a Stop Work Order. This was the second in as may months. The subs are washing out in the streets, the concrete wash out area had overflowed and ran down the hill for about 50 feet and the silt fencing on the eastside is falling down. These are only a few of the items I noticed. I don't want to issue a Stop Work Order but if things keep going like they are I will have no choice. Also EPA is in town and Starr Pass Heights is on the list for sites to visit. Marc Avery City of Tucson 240-9871 |
|
| 05/24/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Met with Bob Mallory on site and went over stormwater issues. Contractor made correction to site. | |
| 05/23/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Issued Correction Notice. Contractor given 3 days to get site in compliance, if not will issue a Stop Work Order. Contractor needs to address: 1- Clean concrete wash out (run off, overflow) 4th. notice. 2- Clean mason wash out in front of lot 30 and 31. 3- Keep streets clean. 4- Clean drywall wash out. Entire project. 5- Keep concrete wash out area in working order. 6- Repair silt fence eastside of project. Contractor needs to get this project in compliance. |
|
| 05/10/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to address: 1- Wash out in street from masons (lot 34). 2- Remove or install stormwater controls around all soil material dumped in street or along curb line. 3- Remove or install stormwater controls around soil material dumped along basin. 4- Cold patch or perm. patch road cut. 5- Keep all streets clean. 6- Clean up around concrete wash out area. Spoke to site super Kevin in regards to issue and walked site. |
|
| 04/25/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to provide proper wash out area for subs. | |
| 04/13/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to address: 1- Clean dirt in streets. 2- Provide proper wash out area for subs and ensure they are using it. 2nd Notice. 3- Remove material from drainage channel. Spoke to site super. |
|
| 03/29/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor cleaned up wash out noted on last inspection. | |
| 03/22/2006 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to address: 1- replace or repair snake bags around project. 2- Provide the appropiate wash out area for mason and stucco subs. 3- Clean silt off street. 4- Clean material out of basin. Talked to site super in regards to issues. Left message for Bob with K.B. homes. |
|
| 03/10/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. Contractor grading along San Marcos Dr. | |
| 02/27/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. | |
| 02/08/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contacted Bob with K.B. Homes in regards to snake bags being pulled to the side and breaking open. Also replacing controls on west side of project at wash cut. | |
| 01/25/2006 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to install controls for drainage channel that drains into wash. West side of project. Talked to site super in regards to issue. | |
| 12/20/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to watch track-out. | |
| 12/06/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to watch track out from building pads. | |
| 11/16/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Contractor needs to make some repairs to stormwater controls along San Marcos and Southside of wash area. Spoke to Bruno super in regards to repairs to stormwater controls. At approx. 1025. |
|
| 11/02/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. | |
| 10/18/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | No concerns at this time. Contractor made repairs to silt fence noticed on last inspection. |
|
| 10/03/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to reinstall stormwater controls near wash. Contacted Bob with KB Homes in regards to issue. |
|
| 09/16/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | 1- Straw bales breaking apart along Mission silt starting to run into street. 2- Westside of property track-out from new entrance. Spoke with Bob with KB Homes at 1135 hours in regards to issues. |
|
| 09/07/2005 | STORMWATER FOLLOW-UP INSP | Partial Approval | Sie in good condition. | |
| 08/15/2005 | STORMWATER FOLLOW-UP INSP | Correction Required | Contractor needs to address: 1- Repair or replace silt fencing as needed and install per plan. 2- Install construction entrances per SWPPP plan. (30'x50') 3- Clean all track-out. 4- Remove all silt from streets. 5- Make repairs to concrete wash out area as needed. 6- Repair or replace missing and damaged sand bags. Contractor will re-schedule when items are addressed. |