Inspection History Details
Inspection Status: Approved
Inspection History: STORMWATER FOLLOW-UP INSP
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/09/2006 | STORMWATER FOLLOW-UP INSP | Approved | ||
| 06/29/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. SILT FENCE INSTALLATION IS IN PROGRESS ON RODEO WASH PERIMETER, COMPLETION IS EXPECTED BY THE END OF THE WEEK. 2. A REVISED SWPPP AND THE GRADING PLAN HAVE BEEN SUBMITTED FOR THE REVIEW. |
|
| 06/21/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | PUNCH LIST ITEMS 1,3 & 4 FROM PREVIOUS INSPECTION HAVE BEEN ADDRESSED. 2. TOUCH UP TEMPORARY SWALE AND BERM TO PROVIDE POSITIVE DRAINAGE TO NORTH OUTFALL. 4. UPDATE SWPPP TO SHOW ALL MODIFICATIONS. 5. VERIFY WITH LANDSCAPE DIVISION (ANDY 349-3640) FOR ANY DISTURBANCE OF PLANTS. |
|
| 06/18/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. PROVIDE ROCK RIP RAP AT THE NORTH SIDE OF THE NEW BUILDING ROOF DRAINAGE OUTLETS. 2. RE-GRADED TEMPORARY SWALE AND BERM TO PROVIDE POSITIVE DRAINAGE TO NORTH OUTFALL. 3. PROVIDE SEDIMENT AND EROSION CONTROLS OR STRING AND STAKES AT GRADING LIMITS AROUND R/D BASIN. 4. UPDATE SWPPP TO SHOW ALL MODIFICATIONS. 5. VERIFY WITH LANDSCAPE DIVISION (ANDY 349-3640) FOR ANY DISTURBANCE OF PLANTS. NOTE: ITEMS 1-4 MUST BE COMPLETED PRIOR TO RE-INSPECTION AT 10:00 AM MONDAY JUNE 21, 2004. |
|
| 06/10/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | 1. RIO WEST HAS CHOSEN TO USE A V-DITCH AND EARTHEN BERM IN LIEU OF THE SILT FENCE SHOWN ON THE SWPPP. THE V-DITCH AND BERM ARE MADE OF UN-COMPACTED LOOSE SOIL THAT WILL NOT CONTAIN THE STORMWATER RUN-OFF. THE RUN-OFF WILL CAQRRY SEDIMENT INTO AN AREA THAT IS SHOWN AS AN UN-DISTURBED NATURAL AREA. THE V-DITCH ON THE NORTH SIDE OF THE NEW BUILDING WILL NOT HANDLE THE RAINWATER RUN-OFF FROM THE ROOF DRAINAGE. 2.THE STRAW BALE INLET PROTECTION AT THE MAIN OUTFALL ON THE NORTH SIDE OF THE PROPERTY HAS A BREACH ON THE WEST SIDE OF THE STRAW BALES. 3. SEDIMENT ACCUMALATION AT THE OUTFALL ON THE NW SIDE OF THE PROPERTY HAS NOT BEEN REMOVED FROM THE UNDISTURBED NATURAL DESERT AREA. 4. INDUSTRIAL WASTEWATER CONTINUES TO DISCHARGE FROM THE FLOOR DRAINS AT THE NW SIDE OF NEW BLDG. |
|
| 06/04/2004 | STORMWATER FOLLOW-UP INSP | Correction Required | THE CORRECTIONS LISTED IN PREVIOUS REPORT HAVE NOT BEEN ADDRESSED. SEE 1-3 ABOVE. 4. ADDRESS THE INDUSTRIAL WASTEWATER DISCHARGE FROM THE (2) FLOOR DRAINS AT THE NORTHEAST SIDE OF THE NEW BUILDING. INDUSTRIAL WASTEWATER CAN NOT BE DISCHARGED TO THE STORMWATER DRAINAGE SYSTEM OR RODEO WASH. |
|
| 06/01/2004 | STORMWATER FOLLOW-UP INSP | Denied | 1. V-DITCH IS UNCOMPACTED LOOSE SOIL THAT WILL ERODE AND NOT CONTAIN RUN-OFF. 2. STRAW BALES ARE NOT PROPERLY INSTALLED. 3. GRADING OUTSIDE GRADING LIMITS IN PREVIOUSLY UNDISTURBED DESERT AREA. |