Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Correction Required
Inspection History: FOLLOW UP CODE VIOLATION
| Date |
Description |
Inspector |
Results |
Comments |
| 08/22/2002 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
ALL REPAIRS AND PERMITS APPLIED FOR AND APPROVED WITH LETTER SIGNED BY TENANT. VIOLATION ABATED. |
| 06/27/2002 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
VISITED SITE AND WORK HAS BEEN COMPLETED EXCEPT SWITCH UNDER SINK STILL INSTALLED. ASK THAT DISPOSAL BE REMOVED OR SWITCH BACK TO ORIGINAL LOCATION. |
| 04/08/2002 |
FOLLOW UP CODE VIOLATION |
|
Correction Required |
HAVE TALKED TO OWNERS OF PROPERTY AND WILL MEET ON THURSDAY OR FRIDAY AT SITE. OWNER WILL BE GETTING PERMIT FOR WATER HEATER DUE TO NOT FOUND IN SYSTEM. |