Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - ROUGH, SOIL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/19/2002 | PLUMBING - ROUGH, SOIL | Approved | IVRS - Inspection 0000* 1.) SOIL WATER TEST IS OK 2.) P.O.C. OF NEW BLDG. DRAIN TO EXSISTING BLDG. DRAIN IS OK 3.) OK TO BACKFILL TRENCH. 4.) NOTE: WILL REQUIRE A REVISED & APPROVED PLAN ON WASTE & VENT SYSTEM PRIOR TO NEXT INSPECTION. |
|
| 12/16/2002 | PLUMBING - ROUGH, SOIL | Denied | IVRS - Inspection 0999*1.) OK TO COVER DEMO'D AREAS. 2.) OK TO COVER NEW P-3 ABS OK COPPER OK 3.) HAVE PLUMBER REVIEW 511.2 ACCESS AND LOCATION OF WATER HEATER. 4.) BATHROOM NOT INSTALLED PER APPROVED PLAN. |