Inspection History Details
Inspection Status: Approved
Inspection History: PLUMBING - GAS PRESSURE TEST
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/03/2003 | PLUMBING - GAS PRESSURE TEST | Approved | IVRS - Inspection 0000* | |
| 11/20/2002 | PLUMBING - GAS PRESSURE TEST | Not ready for Inspection | IVRS - Inspection 0000*1.) PVC YARDWATER FROM METER AREA TO UNDERGROUND VALVE T-5' FROM BLDG. OK SUBJECT TO PRESSURE TEST BRANCHES TO HOSE BIBB ON BLOCK WALL, AND 3/4" FEEDING FOUNTAIN INSPECTED BY STATE INSPECTOR. I DID NOT INSPECT COPPER FITTING UNDER SLAB. 2.) NEED TO SEE ALL CONNECTIONS, AND PRESSURE TEST. 3.) GAS NOT READY. |