Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: ROOF NAILING
| Date |
Description |
Inspector |
Results |
Comments |
| 01/06/2003 |
ROOF NAILING |
|
Approved |
IVRS - Inspection 0000* |
| 01/02/2003 |
ROOF NAILING |
|
Denied |
IVRS - Inspection 0999*/ 1) PROVIDE TRIMMERS AT WINDOW HEADER 2) DOUBLE HEADER (2-2 X 4 ON EDGE AT DOOR 3) PROVIDE PROPER BLOCKING FOR NAILING AT ROOF 4) SECURE ELECTRIC PER NEC 5) J-BOXES REQUIRED TO BE ACCESSIBLE 6) PROVIDE ANTI-SCALD DEVICE FOR SHOWER 7) GFCI REQUIRED AT EXT. ON SEPERATE CIRCUIT 8) WATER TEST REQUIRED AT ABS 9) EXHAUST FAN DUCT REQUIRED TO BE INSTALLED 10) ROMEX CONNECTOR TO METAL BOXES 11) DOOR REQUIRED TO BE FRAMED IN 12) AB REQUIRED WITHIN 12" OF SPLICE OR DOOR 13) WALL TO BE FRAMED IN FOR SHOWER 14) GFCI NOT A PROPER LOCATION AT LAV |
| 12/27/2002 |
ROOF NAILING |
|
Denied |
IVRS - Inspection 0999* PLAN DOES NOT REFLECT AS BUILDT. WORK SUBSTANDARD. NOT READY FOR INSPECTION. I WOULD LIKE TO MEET WITH CONTRACTOR IF POSSIBLE @ NEXT INSPECTION |
| 12/17/2002 |
ROOF NAILING |
|
Denied |
IVRS - Inspection 0999*/ 1) SECURE ROMEX PER CODE 2) J-BOX REQUIRED TO BE ACCESSIBLE 3) PROVIDE NAIL PROTECTION AT BORED HOLES 1 1/4" 4) DOUBLE TOP PLATE REQUIRED AT NORTH WALL PER PLAN 5) H.25 EACH RAFTER TO TOP PLATE PER PLAN |