Inspection Status: Approved
Inspection History: PLUMBING - INTERMEDIATE
| Date |
Description |
Inspector |
Results |
Comments |
| 12/20/2002 |
PLUMBING - INTERMEDIATE |
|
Approved |
IVRS - Inspection 0000* |
| 09/12/2002 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
IVRS - Inspection 0000*1.) ABS DWV WATER TEST OK OK TO COVER UNDERGROUND AFTER VERIFYING DIRECTION OF FLOW. 2.) HAVE PLUMBER REVIEW TABLE 3-1 HANGERS AND SUPPORTS FOR ABS DWV. 3.) CHECK ON SECTION ON VENT GRADES. |
| 08/21/2002 |
PLUMBING - INTERMEDIATE |
|
Partial Approval |
ABS DWV UNDERGROUND OK TIE-IN TO EXISTING IS OK PENDING VERIFICATION OF DIRECTION OF FLOW. TRANSITION FITTINGS OK 2.) WATER TEST OK 3.) OK TO COVER. |
| 08/20/2002 |
PLUMBING - INTERMEDIATE |
|
Denied |
IVRS - Inspection 0999*1.) WHERE IS THE PIPING FOR THE LAVATORY? 2.) ALL BRANCH PIPING OVER FIRE FEET FROM THE MAIN REQUIRES CLEAN OUTS. 3.) AFTER CONCRETE IS POURED HOW DO YOU PLAN ON WATER TESTING ABS THRU ROOF? 4.) PLAN SHOWS WYE FITTING CONNECTED TO MAIN DRAINING TO THE SOUTH. THE CONNECTION IN THE TRENCH FLOWS TO THE NORTH. NOT INSTALLED PER PLAN IF PLAN IS IN ERROR REVISE PLAN. |