Inspection History Details
Inspection Status: Approved
Inspection History: ELECTRIC - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 05/06/2003 | ELECTRIC - FINAL | Approved | IVRS - Inspection 0000*OK C OF O. | |
| 01/31/2003 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0245*NOTES 1.) AS BUILDS NEED TO BE STAMPED AND APPROVED BY C.O.T. PLAN CHECK 2.) EQUIP. NEED TO BE LISTED PER CERTIFIED ELECTRICAL ENGINEER. |
|
| 12/19/2002 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0999* 1.) APPEAR THAT INSTALLATION NO LONGER REFLECTS APPROVED PLAN PROVIDE ACCURATE AS BUILTS AS INSTALLED. 2.) 400A PNLS F & E NEED TO BE 22,000 RATED 3.) NEW LATHE'S & MILLS JAPAN ARE NOT LISTED 4.) PANEL SCHEDULES DO NOT REFLECT ACTUAL INSTALLATION AS BUILTS TO REFLECT CHANGES. LISTINGS REQUIRED PER NEC 110-3 PLEASE PROVIDE A LISTING FOR ALL UNLISTED EQUIPMENT AMERICAN OR FORIENG. |
|
| 10/04/2002 | ELECTRIC - FINAL | Partial Approval | IVRS - Inspection 0000* | |
| 10/04/2002 | ELECTRIC - FINAL | Partial Approval | TEMP C OF O.. | |
| 09/26/2002 | ELECTRIC - FINAL | Partial Approval | SERVICE APPROVED: 4355 'E' AND 'F' TEMP C OF O APPROVED SUBJECT TO OTHER INSPECTOR. WILL NEED LETTER FROM LICENSED CONTRACTOR STATING THAT SAID COMPANY IN DOING THE ELECTRIC WORK AND HOOK UP. EQUIPMENT TO BE INSTALLED IN INCREMENTS OF DAYS AND TO BE USED AS COMPLETED NOTE WILDAN REVISION ATTACHED. | |
| 09/19/2002 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0999*IMPROPERLY SIZED BONDING JUMPER AN SUPPLY SIDE RISERS AD MAIN BONDING JUMPER. SHOULD BE 3/0 AWG MIN. NEED CITY APPROVED LETTER AND REFERENCE TO SAME KEY NOTE AND INSERT ACTIVITY NUMBER. A REFEE IS DUE BEFORE THE NEXT. | |
| 09/13/2002 | ELECTRIC - FINAL | Denied | IVRS - Inspection 0999* NEED ACCURATE CITY APPROVED REVISION FOR ONE LINE DIAGRAM. SHOW ALL WIRE SIGN GROUND ELECTRODE SYSTEM NEED PROPERTY SIZED BOND. JUMPER & MAIN BOND JUMPER. |